Date: 03-04-08
Time: 1245hrs
Box: 1465
Location: 102 E. 124th St X Park/Lexington
Description Of Incident: Units originally operating at a facade collapse, building then fully collapsed.
Writer: Truck4

1245hrs- All-Hands operating for a facade collapse off the side of a building. PD with a Level 1 Mobilization. Metro North train traffic to proceede at reduced speed.

1400hrs- R-3/Collapse Rescue responding.

1509hrs- Div. 3 transmitting 10-60 (Major Emergency/Collapse)-2nd Alarm for major collapse of the building.
10-60 Special Units: E-60, L-43, L-17 (FAST), L-25; R-1/Rescue Collapse 1, Squad 1/TRV, L-27/SOC Support, L-117/SOC Support, E-93/Mobile Command, SOC Compessor Unit, SOC Logistics Unit; B-10, 16 (Safety), 11 (RUL)

1511hrs- Div. 3 rpts Command Post is at 124th X Park Ave (under the 'L') . Staging area is at 125th St. X Park, units to use Park or Madison. Also req. complete shut down of Metro North and Amtrak Traffic.

1525hrs- Con Ed Vacuum Truck enroute.

1527hrs- Div. 3 rpts roll call has been conducted with all members accounted for.


Nycfire.net

3/4 Manhattan 2-2-1465 (10-60)
« on: March 04, 2008, 03:44:17 PM »

Offline 262

  • Newbie
  • *
  • Posts: 8
Re: 3/4 Manhattan 2-2-1465 (10-60)
« Reply #1 on: March 04, 2008, 03:54:55 PM »
any one have a full rundown

Offline catry

  • Hero Member
  • *****
  • Posts: 1985
Re: 3/4 Manhattan 2-2-1465 (10-60)
« Reply #2 on: March 04, 2008, 07:34:56 PM »
I don't have a full rundown but the initial was a verbal box from Battalion 12 for a minor collapse.

Verbal Box 1465 - Minor Collapse Assignment for structural instability and falling facade
Engs. 35, 58, 91
L26
TL14 (SOC Support Truck)
Rescue 3 w/ Collapse Rescue 3
Squad 41
Battalion 12
Safety Battalion
Rescue Battalion
Division 3
Tactical Support 1

7-5-1465 - All Hands for partial facade collapse.  No members operating in building, evacuating the area and giving verbal warning for possible squatters.  Rescue battalion, safety battalion, Rescue and Squad are making a determination of building integrity.  Tower Ladder set up making an exterior examination.
RAC1

14:00 hours
All first alarm companies reassigned due to further collapse.  Collapse zone established.

2-2-10-60-1465 - Major collapse assignment for partial building collapse.  Roll call in progress.
Engs. 60, 53, 22, ?, ?
E93 w/ Mobile Command Center 2
E9 w/ Satellite 1
L43, TL13
TL17 is the FAST truck
L25 w/ Collapse Rescue 1
L27, TL117 (SOC Support Trucks(
Rescue 1
Battalion 10
Battalion 16 (Safety Officer)
Battalion 11 (Resource Unit Leader)
Division 6
Squad 1 w/ TRV
SOC Compressor
SOC Logistics
FieldCom

Staging area:  E125th St and Park Ave.

As of 16:00 hours tracks 2 and 4 on Metro North were reopened with 10 mph restriction
As of 17:30 hours incident was probably will hold.
As of 19:30 hours incident was under control, in the process of relieving units.  Awaiting demolition crew, 3 of 4 tracks on Metro-North reopened with 10 mph restriction.  Squad 61 S/C for relief.