Wasted manpower!! Having pre-connected hose lines saves time. Having a pre-connected 200' or 300' attack line is ideal (400' in some 1st due areas). If the room allows in the hose bed/ and if longer lines are needed, having another 200 to 300ft dead lay under the pre connected line would be...