75-1856 on 2/26

Joined
Jul 14, 2007
Messages
4,533
@1600: 10-75-1856 by Engine 236 for a fire on the second floor at 219 Hemlock Street, East New York Section of Brooklyn.

Engines 236, 293, 332    Ladders 175, 107  Bn. 39

Engine 225 (4th due), Ladder 135 (fast truck), Squad 252, Rescue 2, Bn. 44, Div. 15

Ladder 135 advises delayed: stuck behind a car; Ladder 142 assigned as new fast truck and Ladder 135 advised to continue to attempt to respond.

CIDS: 2 story 25 x 60 with window bars in the basement, Collyers Mansion conditions on the second floor.

@1606: 75-1856: Bn. 39 reports using all hands for a fire in a 2 story 40 x 60 OMD, 2 lines stretched, one line in operation, trucks opening up, primary search being conducted, fire is doubtful.  Exposures: 1- street, 2- similar attached, 3- yard, 4- similar attached.

@1612: Bn. 39: primary search of basement, first and second floors is negative.  Fire duration is 17 minutes.

@1616: Bn. 39: fire is probably will hold.  Fire duration 21 minutes.

@1616: Engine 218 acting Engine 236 is 10-8.   Ladder 132 relocated to Ladder 175.

@1626: Div. 15: secondary search of basement and first floor is negative, secondary on the second floor delayed due to Collyers Mansion conditions, fire is under control, Div.15 is 10-8, Bn. 39 is the IC.  Fire duration is 31 minutes.
 
Top