8/12/20 Bronx 3rd Alarm Box 3106

Joined
Aug 5, 2015
Messages
3,996
Address: 551 East 179th St. at Monterey Ave.

Fire throughout a 1 story 75x100 warehouse

CIDS: Warehouse 1 story 75x100 class 3 - No roof operations - 2nd floor is a 10ft facade with windows - Heavy fire load - Collapse potential - No basement - Consider exterior attack

L-27: You have an apt. for us? BXD : Negative, no apt. just an address - 12:11

BXD: Attention all units into box 3106 - Corrected address will be 551 East 179 (Following units were raised: E-88, 45, 42, L-27, 38 & B-18) - 12:12

Phone Alarm Box 3106 - Reporting a fire - 12:12

E-88: Advise all units we have heavy smoke in the area - 12:14

L-27: Urgent - 10-75 - Fire in a commercial, electrical supply store - 12:14

B-18: Contact the units on scene & make sure they're aware of the "no-roof-opps" - 12:15

L-27: Transmit a 10-70 (E-42 WRU) - 12:16

B-18: All Hands - Extra E&T - Make sure that truck is a TL - 12:16

TL-58: You have us as the FAST truck, do you wanna reassign us as a TL? - BXD: 10-4 - 12:17

L-56 FAST

D-7: Transmit a 2nd Alarm - 2 L/S/O - Fire in the cockloft - 12:23

B-17 RUL, B-27 Safety, E-72 w/ Sat. 2

D-7: Have a Con Ed rep. respond - We have a substation behind the fire building - 12:29

D-7: Roll call has been conducted - All members are accounted & removed from the building - 12:30

D-7: Exterior operations - 3 L/S & 2 TL's in operation - MBF darkening down - DWH - 12:38

D-7: Special cal an additional TL (TL-144 act. 58) - 13:09

FC: By orders of C-10, Transmit a full 3rd Alarm - Make sure 1 of the trucks is a TL - 13:20

B-13 FF, B-3 Staging, 58 Air Recon, E-35 Communications

Staging: 3rd Ave. at 180th St.

FC: Special call a truck to relieve the FAST truck (TL-31) - 13:21

FC: Fire through the roof - 2 multiversals, 2 handlines & 2 TL's in operation - There're 2 propane tanks on the roof, 1 of them is rolling around - We're backing the members further away from the building - DWH - 13:48

FC: Special call Squad 61 & they'll relieve SQ-41 & R-3 - 14:00

FC: Per C-10, We have a partial collapse of the roof - The walls are still freestanding - 2 multiversals & 2 TL's in operation - 1 handline operating in exposure 4 - DWH - 14:27

FC: Special call a truck to relieve the FAST truck (L-59) - 14:45

FC: Per C-10, MBFKD - Using the drone to evaluate the parapet wall - 1 still TL in operation - 15:19

FC: Special call 2 TL's (TL-54 act. 58 & TL-117 act. 44) - 15:21

FC: Special call an additional RAC unit to relieve RAC-1 (RAC-4) - 16:13

FC: Special call a BC for relief (B-45 act. 3) - 16:22

FC: Per D-7, 2 TL's still in operation hitting hot spots - PWH - 16:29

B-14: Under Control - 20:46

Duration: 8 hours & 36 min.

All Hands+ Maybe:
E*88, 45, 42, 48, 75 s/c
L-27, 38, 58, 56F, 33 s/c
B-18, 19
R-3
SQ-41
D-7
CTU
RAC-3

*Looks like E-46 was initially unavailable.

2nd Alarm Maybe:
E-46, 92, 82
L-144 (act. 58) s/c
B-26, 17R, 27S
FC, RB, SB, TSU-1, RM
E-72 w/ Sat. 2
Car-10

3rd Alarm:
E-50, 79, 94, 73
L-44, 19, 31F s/c, 59F s/c, 54 (act. 58) s/c, 117 (act. 44) s/c
B-13, 3 Staging, 58 Air Recon, 45 (act. 3) s/c
SQ-61 s/c
MSU
E-35 Communications
RAC-1, 4 s/c
Car-22f, 23d, 12a

Watchline at 18:00
E-
L-51
B-14

Some Relocations:
E-305 to E-45
E-81 to E-46
E-37 to E-75
E-66 to E-88
E-67 to E-42
E-297 to E-82
E-53 to E-79
E-64 to E-50
L-26 to L-38
L-32 to L-27
TL-13 to L-19
TL-144 to TL-58
TL-23 to TL-33
TL-117 to TL-44
TL-54 to TL-58

TL-152 to TL-58
B-52 to B-18
B-16 to B-19
B-10 to B-17
B-7 to B-16
B-45 to B-3
 