- Joined
- Jan 20, 2014
- Messages
- 16,893
Fire Location: 115-25 123 St
Reported as a fire in a PD
Loading up the box. Couple calls and the class 3
E-308 gave the 10-75
Fire out the rear 1st floor of a 2 1/2 story peaked roof PD
L-126 Fast
B-51 All Hands extra Engine & Truck
E-308,302,Sq-270,285,303s/c
L-155,142,126(Fast),133s/c,143s/c
B-51,50
R-4
Sq-288
D-13
Rac-4
E-274 w/ 2nd Piece
HM-1
HMB
D-13 heavy fire 1st fl 2nd fl & cellar. 3 L/S 2 in Opp
D-13 start out Haz-Mat for an e-bike
D-13 s/c an additional truck
Reported as a fire in a PD
Loading up the box. Couple calls and the class 3
E-308 gave the 10-75
Fire out the rear 1st floor of a 2 1/2 story peaked roof PD
L-126 Fast
B-51 All Hands extra Engine & Truck
E-308,302,Sq-270,285,303s/c
L-155,142,126(Fast),133s/c,143s/c
B-51,50
R-4
Sq-288
D-13
Rac-4
E-274 w/ 2nd Piece
HM-1
HMB
D-13 heavy fire 1st fl 2nd fl & cellar. 3 L/S 2 in Opp
D-13 start out Haz-Mat for an e-bike
D-13 s/c an additional truck
Last edited: