- Joined
- Mar 30, 2023
- Messages
- 781
355 5th Avenue
B. Altman's Department
0306 BOX TRANSMITTED E065 L024 L007 BC09 RS01
0308 ROSTER STAFFING E001
0340 10-75 E016 E054 BC07
0342 7-5 E026 DC02
0343 2-2 E008 E034 E014 L004 L021 L012 BC08
E018 ST01 FC01 SB01 RA01 TS01
0356 S/C BC10
0405 PROGRESS REPORT 1 LINE STRETCHED AND IN OPERATION. SECOND LINE BEING
STRETCHED. FIRE IS DARKENING DOWN. TRUCKS ARE OPENING UP
AND CHECKING FOR EXTENSION.
0410 PROGRESS REPORT TRANSMIT A 3RD ALARM. 3 LINES STRETCHED AND OPERATING. A
STAGING AREA HAS BEEN SET UP ON THE 5TH FLOOR. HAVE
TRUCKS REPORT TO THE IC WITH 10 & 12 FOOT HOOKS. WE ARE
HAVING DIFFICULTY OPENING UP THE ROOF DUE TO ONGOING
CONSTRUCTION.
0410 3-3 E023 E005 E033 E040 L043 BC02
E027 MW01 E284 ST03 MK01
0411 S/C L008 L035
0416 S/C E003 L003 BC06
0440 PROGRESS REPORT SPECIAL CALL HAZ-MAT AND CAR 40A DUE TO ASBESTOS
ABATEMENT SIGNS. 3 LINES STRETCHED OFF THE STANDPIPE.
WATER IS GETTING ON THE FIRE.
0440 S/C HM01
0448 S/C RA03 RA04
0449 PROGRESS REPORT TRANSMIT A 4TH ALARM FOR ROTATING RELIEF SYSTEM &
ACTIVATE THE RESERVE STAFF CHIEF.
0449 4-4 E028 E055 E039 E022 L002
0455 S/C L009
0518 S/C BC16
0530 S/C BC12
0536 S/C SB02
0617 S/C L015 HD01
0628 5-5 E021 E044 E024 E009 L005
0629 S/C L016 L020
0637 S/C DC01
0730 S/C BC04
0742 S/C BC01 BC11
0749 PROGRESS REPORT THE FIRE IS NOW PROBABLY WILL HOLD. SPECIAL CALL 5
ENGINES.
0749 S/C E015 E007 E076 E006 E058
0848 S/C DC06
0904 S/C E073 E303 E242 L056 L136 L026 L050 L035
0907 S/C RS04
0909 S/C E289 E075 E245
1006 S/C L040
1029 S/C RA02
1122 S/C RS03
1203 S/C E004 E035 E095 L013 BC20 BC44
1206 S/C L010
1208 S/C E249
1211 S/C TS02
1238 S/C RA05
1314 PROGRESS REPORT HEAT HAS BEEN KNOCKED DOWN. UNITS WILL BE REMAINING ON
THE SCENE. THIS WILL BE A PROLONGED OPERATION. UNDER
CONTROL.
B. Altman's Department
0306 BOX TRANSMITTED E065 L024 L007 BC09 RS01
0308 ROSTER STAFFING E001
0340 10-75 E016 E054 BC07
0342 7-5 E026 DC02
0343 2-2 E008 E034 E014 L004 L021 L012 BC08
E018 ST01 FC01 SB01 RA01 TS01
0356 S/C BC10
0405 PROGRESS REPORT 1 LINE STRETCHED AND IN OPERATION. SECOND LINE BEING
STRETCHED. FIRE IS DARKENING DOWN. TRUCKS ARE OPENING UP
AND CHECKING FOR EXTENSION.
0410 PROGRESS REPORT TRANSMIT A 3RD ALARM. 3 LINES STRETCHED AND OPERATING. A
STAGING AREA HAS BEEN SET UP ON THE 5TH FLOOR. HAVE
TRUCKS REPORT TO THE IC WITH 10 & 12 FOOT HOOKS. WE ARE
HAVING DIFFICULTY OPENING UP THE ROOF DUE TO ONGOING
CONSTRUCTION.
0410 3-3 E023 E005 E033 E040 L043 BC02
E027 MW01 E284 ST03 MK01
0411 S/C L008 L035
0416 S/C E003 L003 BC06
0440 PROGRESS REPORT SPECIAL CALL HAZ-MAT AND CAR 40A DUE TO ASBESTOS
ABATEMENT SIGNS. 3 LINES STRETCHED OFF THE STANDPIPE.
WATER IS GETTING ON THE FIRE.
0440 S/C HM01
0448 S/C RA03 RA04
0449 PROGRESS REPORT TRANSMIT A 4TH ALARM FOR ROTATING RELIEF SYSTEM &
ACTIVATE THE RESERVE STAFF CHIEF.
0449 4-4 E028 E055 E039 E022 L002
0455 S/C L009
0518 S/C BC16
0530 S/C BC12
0536 S/C SB02
0617 S/C L015 HD01
0628 5-5 E021 E044 E024 E009 L005
0629 S/C L016 L020
0637 S/C DC01
0730 S/C BC04
0742 S/C BC01 BC11
0749 PROGRESS REPORT THE FIRE IS NOW PROBABLY WILL HOLD. SPECIAL CALL 5
ENGINES.
0749 S/C E015 E007 E076 E006 E058
0848 S/C DC06
0904 S/C E073 E303 E242 L056 L136 L026 L050 L035
0907 S/C RS04
0909 S/C E289 E075 E245
1006 S/C L040
1029 S/C RA02
1122 S/C RS03
1203 S/C E004 E035 E095 L013 BC20 BC44
1206 S/C L010
1208 S/C E249
1211 S/C TS02
1238 S/C RA05
1314 PROGRESS REPORT HEAT HAS BEEN KNOCKED DOWN. UNITS WILL BE REMAINING ON
THE SCENE. THIS WILL BE A PROLONGED OPERATION. UNDER
CONTROL.