11/29/26 Staten Island 3rd Alarm Box 0729

Joined
Jan 31, 2026
Messages
104
Fire Location: 974 Post Avenue
Staging Area: Jewett Ave & Post Ave
Incident Command: Deputy Assistant Chief Keenan

Size-Up: 20X45 2½ Story Class 4 PD - Peaked Roof

SID: Phone alarm reporting a Fire in a PD @ 15:13

SID: Loading up the box due to the quantity of calls @ 15:16

E-157: Urgent, 10-75 @ 15:17

B-22: All Hands. Heavy Smoke pushing out the PD @ 15:17

B-22: Urgent, Transmit the 2nd Alarm. Fire throughout All Floors @ 15:21

B-22: 3 L/S 2 O/P. Primary searches underway. Water on the Fire. Doubtful @ 15:22

SID: Fallback Step 3 @ 15:25

D-8: Primary searches complete and negative. Doubtful @ 15:29

D-8: Special call 1 additional tower ladder @ 15:39

D-8: 4 L/S/O @ 15:39

D-8: 3rd Alarm @ 15:40

D-8: All visible fire knocked down. Trucks opening up, checking for extension. Doubtful @ 15:51

SID: L-85 was involved in a accident @ 16:04

D-8: B-39 ARC can remain in service @ 16:05

D-8: Special call 2 additional trucks @ 16:06

D-8: 5 L/S/O. Secondary searches in progress @ 16:07

FC: Car 4C reports: 2 Tower Ladders set up. Companies still hitting pockets of Fire @ 16:25

FC: Car 4C reports: Secondary searches complete and negative. Doubtful @ 16:31

FC: Special call 1 additional truck to relieve the FAST Truck @ 16:46

FC: Car 4C reports: Still hitting pockets of Fire. Probably Will Hold @ 16:53

FC: Mixer off message @ 16:55

FC: Car 4C reports: Secondary searches complete and negative.Under Control @ 17:09

FC: 10-41 code 1. Fire started from the Exterior @ 17:10

FC: Requesting DOB to check the stability of the roof (Partial Collapse). Special call 1 engine for Watch Line @ 17:12

Duration: 1 hour and 56 minutes

Exposures:
1. Street
2. 3 Story Mixed Occupancy
3. Rear yard
4. Similar detached

Rundown:
E-157, 156, 163, 158, 166
E-159 w/ Sat. 5
L-80, 79, 83 (FAST relieved), 86
B-22, 21
D-8
R-5
SQ-8
RAC 5

2nd Alarm:
E-155, 160
L-78
B-23 FF, 42 RUL, 48 Safety
RB, SB, FC, Tac-2, RM, CTU-2
Car 4C (DAC of Operations)

3rd Alarm:
E-201 Act. 156, 152, 165, 161
L-148 Act. 80, 81
B-40 Act. 22, 43 Staging, 39 ARC
MSU
RAC 1
Car 22D (Deputy Director of Fleet Services), Car 23D (Press Duty), Car 24 (Director of Bureau of Logistics & Support), Car 12C (Safety Liaison), Car 32 (Medical Officer BX & M)

Special Called @ 15:39:
L-85

Special Called @ 16:06:
L-161 Act. 79, 109 Act. 83

Relief @ 16:46:
L-15 Act. 86 (FAST)

Special Called @ 17:12:
E-153

Relocations:
Engine 201 Act. Engine 156
Engine 242 Act. Engine 158
Engine 279 Act. Engine 163
Engine 282 Act. Engine 166
Engine 318 Act. Engine 155
Engine 243 Act. Engine 152
Engine 285 Act. Engine 160
Engine 241 Act. Engine 165
Engine 7 Act. Engine 157
Ladder 109 Act. Ladder 83
Ladder 126 Act. Ladder 83
Ladder 161 Act. Ladder 79
Ladder 12 Act. Ladder 79
Ladder 148 Act. Ladder 80
Ladder 101 Act. Ladder 81
Ladder 15 Act. Ladder 86
Battalion 40 Act. Battalion 22
Battalion 51 Act. Battalion 22
Battalion 31 Act. Battalion 42
Battalion 32 Act. Battalion 21
Squad 288 Act. Squad 8

B58 Unavailable
 
Last edited:
Fire Location: 974 Post Avenue

Size-Up: 20X50 2½ Story Class 4 PD

SID: Phone alarm reporting a Fire in a PD @ 15:15

SID: Loading up the box due @ 15:16

E-157: Urgent, 10-75 @ 15:17

B-22: All Hands. Heavy Smoke pushing out the PD @ 15:17

Rundown:
E-157, 156, 163, 158, 166
E-159 w/ Sat. 5
L-80, 79, 83 (FAST), 86
B-22, 21
D-8
R-5
SQ-8
RAC 5
Citizen App Photo
IMG_6832.jpeg
 
Many companies in the same area of BK relocated including the full house of 282/148. E201, 242, 282, L148, L109 and the 40 all run in with eachother in some way or close to it.
 
Fire Location: 974 Post Avenue
Staging Area: Jewett Ave & Post Ave

Size-Up: 20X45 2½ Story Class 4 PD - Peaked Roof

SID: Phone alarm reporting a Fire in a PD @ 15:15

SID: Loading up the box due to the quantity of calls @ 15:16

E-157: Urgent, 10-75 @ 15:17

B-22: All Hands. Heavy Smoke pushing out the PD @ 15:17

B-22: Urgent, Transmit the 2nd Alarm. Fire throughout All Floors @ 15:21

B-22: 3 L/S 2 O/P. Primary searches underway. Water on the Fire. Doubtful @ 15:22

SID: Fallback Step 3 @ 15:25

D-8: Primary searches complete and negative. Doubtful @ 15:29

D-8: Special call 1 additional tower ladder @ 15:39

D-8: 4 L/S 4 O/P @ 15:39

D-8: 3rd Alarm @ 15:40

D-8: All visible fire knocked down. Trucks opening up, checking for extension. Doubtful @ 15:51

SID: L-85 was involved in a accident @ 16:04

D-8: B-39 ARC can remain in service @ 16:05

Exposures:
1. Street
2. 3 Story Mixed Occupancy
3. Rear yard
4. Similar detached

Rundown:
E-157, 156, 163, 158, 166
E-159 w/ Sat. 5
L-80, 79, 83 (FAST), 86
B-22, 21
D-8
R-5
SQ-8
RAC 5

2nd Alarm:
E-155, 160, 153
L-78
B-23 FF, 42 RUL, 48 Safety
RB, SB, FC, Tac-2, RM, CTU-2
Car 4C (DAC of Operations)

3rd Alarm:
E-201 Act. 156, 152, 165, 161
L-148 Act. 80, 81
B-40 Act. 22, 43 Staging, 39 ARC
MSU
RAC 1
Car 22D (Deputy Director of Fleet Services), Car 23D (Press Duty)

Special Called @ 15:39:
L-85

Relocations:
Engine 201 Act. Engine 156
Engine 242 Act. Engine 158
Engine 279 Act. Engine 163
Engine 282 Act. Engine 166
Engine 318 Act. Engine 155
Engine 241 Act. Engine 165
Engine 243 Act. Engine 152
Ladder 109 Act. Ladder 83
Ladder 161 Act. Ladder 79
Ladder 148 Act. Ladder 80
Ladder 101 Act. Ladder 81
Battalion 40 Act. Battalion 22
Battalion 31 Act. Battalion 42
Squad 288 Act. Squad 8

B58 Unavailable
TL85 involved in a minor MVA a block away from job, chauffeur is waiting for BC. Members walked to the job.
 
Back
Top