Richmond Hill, Queens, NY, 1/6/09
Address: 112-04 Jamaica Ave between 112 and 113 sts
Box 9642
E294, Squad 270, E308
L143, TL142
Battalion 51
10-75-9642 - 13:56 hours
E285
L151 is the FAST truck
Battalion 50
Rescue 4
Division 13
CIDs for 112-04 Jamaica Ave:
Mixed Occupancy 3 story 20x50 class 3 2nd of 5 non-fireproof structure. 1st floor: laundromat. 2nd and 3rd floor: railroad apartments. Major alteration, exposure 2 and 4 walls. Heavy construction equipment exposure 1 exterior.
13:58 hours
Battalion 51: We're using All-Hands, extra engine and truck, looks like we have fire on the 1st floor in the ceiling of the laundromat, we have fire between the 1st and 2nd floor.
E293, L126 S/C
Squad 252
RAC4
14:00 hours
BC51: We've got 2 line stretched, in operation, trucks are trying to open up the ceiling, looks like we have fire between the 1st and 2nd floor, fire is Doubtful.
14:03 hours - Duration 12 minutes
14:03 hours
E299 is relocating to E294
TL164 is relocating to TL142
14:10 hours - Duration 18 minutes
Division 13: Primaries in the fire building throughout are negative.
14:12 hours
L150 is 10-8 in L126's response area
14:19 hours
E332 is relocating to E285
14:20 hours - Duration 29 minutes
DC13: Box 9642, we have 3 lines stretched, 2 in operation, fire in the ceiling of the laundromat extended to 2nd floor, all visible fire has been knocked down, Probably Will Hold.
14:34 hours - Duration 42 minutes
DC13: Secondary searches are still in progress, but we're going to go Under Control.
14:50 hours - Duration 59 minutes
DC13: Secondaries throughout are complete and negative.
Address: 112-04 Jamaica Ave between 112 and 113 sts
Box 9642
E294, Squad 270, E308
L143, TL142
Battalion 51
10-75-9642 - 13:56 hours
E285
L151 is the FAST truck
Battalion 50
Rescue 4
Division 13
CIDs for 112-04 Jamaica Ave:
Mixed Occupancy 3 story 20x50 class 3 2nd of 5 non-fireproof structure. 1st floor: laundromat. 2nd and 3rd floor: railroad apartments. Major alteration, exposure 2 and 4 walls. Heavy construction equipment exposure 1 exterior.
13:58 hours
Battalion 51: We're using All-Hands, extra engine and truck, looks like we have fire on the 1st floor in the ceiling of the laundromat, we have fire between the 1st and 2nd floor.
E293, L126 S/C
Squad 252
RAC4
14:00 hours
BC51: We've got 2 line stretched, in operation, trucks are trying to open up the ceiling, looks like we have fire between the 1st and 2nd floor, fire is Doubtful.
14:03 hours - Duration 12 minutes
14:03 hours
E299 is relocating to E294
TL164 is relocating to TL142
14:10 hours - Duration 18 minutes
Division 13: Primaries in the fire building throughout are negative.
14:12 hours
L150 is 10-8 in L126's response area
14:19 hours
E332 is relocating to E285
14:20 hours - Duration 29 minutes
DC13: Box 9642, we have 3 lines stretched, 2 in operation, fire in the ceiling of the laundromat extended to 2nd floor, all visible fire has been knocked down, Probably Will Hold.
14:34 hours - Duration 42 minutes
DC13: Secondary searches are still in progress, but we're going to go Under Control.
14:50 hours - Duration 59 minutes
DC13: Secondaries throughout are complete and negative.