Address: 95-33 109 Street
Basement fire in a 3 story 20x40 peaked roof PD.
0708 - E-285 - 10-75 the box.
L-126 FAST
0713 - Bn. 51 - All Hands for fire in the basement. 2 L/S, 1 L/O. Trucks opening up.
0718 - Div. 13 - We have water on the fire. Primaries are negative on the 1st and 2nd floors. There is heavy debris in the basement, primaries will be delayed in the basement with extended operations. DWH
0721 - Div. 13 - All visible fire has been knocked down. Trucks opening up, checking for extension.
0724 - Div. 13 - Primaries throughout are negative. PWH - Duration 19 minutes.
0733 - Div. 13 - Secondaries throughout are complete and negative. We have (2) 10-45's - (1) code 3 - (1) code 4. Under Control - Duration 28 minutes.
Maybe (Box 8582 went out minutes earlier for a gas leak - several units responded from this other box):
E-285, S270, 308, 294
L-142, 143, 126F
B-51, 50
S-288
R-4
D-13
RAC-4
Basement fire in a 3 story 20x40 peaked roof PD.
0708 - E-285 - 10-75 the box.
L-126 FAST
0713 - Bn. 51 - All Hands for fire in the basement. 2 L/S, 1 L/O. Trucks opening up.
0718 - Div. 13 - We have water on the fire. Primaries are negative on the 1st and 2nd floors. There is heavy debris in the basement, primaries will be delayed in the basement with extended operations. DWH
0721 - Div. 13 - All visible fire has been knocked down. Trucks opening up, checking for extension.
0724 - Div. 13 - Primaries throughout are negative. PWH - Duration 19 minutes.
0733 - Div. 13 - Secondaries throughout are complete and negative. We have (2) 10-45's - (1) code 3 - (1) code 4. Under Control - Duration 28 minutes.
Maybe (Box 8582 went out minutes earlier for a gas leak - several units responded from this other box):
E-285, S270, 308, 294
L-142, 143, 126F
B-51, 50
S-288
R-4
D-13
RAC-4