10/26/2025 Manhattan All Hands Box 0904

Joined
Oct 17, 2013
Messages
6,062
Address: 358 East 57 Street - between 1st and 2nd Avenue

Fire in the duct work of a 4 story commercial.

Box loaded up due to calls.

1318 - Bn. 8 - Transmit the 10-75. Looks like we have fire near the top floor.

L-4 FAST

1319 - Manhattan - Reports of an explosion in the kitchen of the restaurant at 356 East 57 Street.

1322 - Bn. 8 - All Hands (E-54, TL-35). Fire appears to be in the duct work of a restaurant. Heavy smoke coming from the duct work. 2 L/S, 1 L/O, searches are in progress.

1330 - Bn. 8 - All primary searches in the fire building are complete and negative.

1334 - Bn. 8 - Requesting an additional Truck (L-43 act. L-2).

1338 - Div. 3 - We have water on the fire. Notify the Board of Health for a restaurant named "Derby" and Con-Ed; we shut off the gas.

1340 - Div. 3 - We have one line operating in the duct work on the exterior of the building. There is no extension. PWH - Duration 27 minutes.

1358 - Div. 3 - Secondaries are complete and negative. Under Control - Duration 45 minutes.

Maybe:
E-8, 39, 21, 44, 54
L-2, 16, 4F, 35, 43 act. 2 s/c
B-8, 10
S-18
R-1
D-3
RAC-1

Relocations:
E-15 act. E-8
L-43 act. L-2
L-11 act. L-2
L-8 act. L-4
 
Last edited:
Address: 358 East 57 Street - between 1st and 2nd Avenue

Fire in the duct work of a 4 story commercial.

Box loaded up due to calls.

1318 - Bn. 8 - Transmit the 10-75. Looks like we have fire near the top floor.

L-4 FAST

1319 - Manhattan - Reports of an explosion in the kitchen of the restaurant at 356 East 57 Street.

1322 - Bn. 8 - All Hands (E-54, TL-35). Fire appears to be in the duct work of a restaurant. Heavy smoke coming from the duct work. 2 L/S, 1 L/O, searches are in progress.

1330 - Bn. 8 - All primary searches in the fire building are complete and negative.

1334 - Bn. 8 - Requesting an additional Truck (L-43 act. L-2).

1338 - Div. 3 - We have water on the fire. Notify the Board of Health for a restaurant named "Derby" and Con-Ed; we shut off the gas.

1340 - Div. 3 - We have one line operating in the duct work on the exterior of the building. There is no extension. PWH - Duration 27 minutes.

1358 - Div. 3 - Secondaries are complete and negative. Under Control - Duration 45 minutes.

Maybe:
E-8, 39, 21, 44, 54
L-2, 16, 4F, 35, 43 act. 2 s/c
B-8, 10
S-18
R-1
D-3
RAC-1

Relocations:
E-15 act. E-8
L-43 act. L-2
L-11 act. L-2
L-8 act. L-4
8, 39, 23, 21, 54
 
Back
Top