- Joined
- Oct 17, 2013
- Messages
- 5,961
Address: 120-40 199 Street - between 120 & 122 Avenue
Fire on the 2nd floor of a 2 story 20x40 peaked roof PD.
0714 - Bn. 54 - 10-75 the box. Fire on the 2nd floor.
L-150 FAST - TL-162 window bars
0716 - Bn. 54 - All Hands - Heavy fire on the 2nd floor.
0720 - Bn. 54 - 2 L/S, 1 L/O, water on the fire, primaries are negative on the 1st floor and basement.
0721 - Bn. 54 - We're going to use Ladder 158 as the FAST Truck, MBFKD. PWH - Duration 10 minutes.
0726 - Bn. 54 - Secondaries are complete and negative. Under Control - Duration 15 minutes.
Maybe:
E-317, 275, 311, 301
L-165, 158, 150F, 162 w/b
B-54, 50
S-270
R-4
D-13
RAC-2
Fire on the 2nd floor of a 2 story 20x40 peaked roof PD.
0714 - Bn. 54 - 10-75 the box. Fire on the 2nd floor.
L-150 FAST - TL-162 window bars
0716 - Bn. 54 - All Hands - Heavy fire on the 2nd floor.
0720 - Bn. 54 - 2 L/S, 1 L/O, water on the fire, primaries are negative on the 1st floor and basement.
0721 - Bn. 54 - We're going to use Ladder 158 as the FAST Truck, MBFKD. PWH - Duration 10 minutes.
0726 - Bn. 54 - Secondaries are complete and negative. Under Control - Duration 15 minutes.
Maybe:
E-317, 275, 311, 301
L-165, 158, 150F, 162 w/b
B-54, 50
S-270
R-4
D-13
RAC-2