Address: 365 W 34 Street off 9th Ave.
Fire in the 1st floor restaurant of a 4 story 25x50 brick mixed occupancy.
1022 - E-26 - Transmit the 10-75.
L-4 FAST
1024 - Bn. 7 - All Hands - Extra Engine and Truck (E-65, TL-12). Fire in the duct work.
1026 - Bn. 7 - 1 L/S/O, searches in progress. Advise TL-12 that they are needed for roof operations.
1030 - Bn. 7 - All visible fire is knocked down. Primaries are negative on the floors above. Checking for extension in the duct work of exposure 2. DWH
1035 - Bn. 7 - 2 L/S/O, we have a light smoke condition in exposure 2. Secondaries are complete and negative in the floors above and exposure 2.
1040 - Bn. 7 - This will be an extended operation. We have lots of overhaul, have to check the duct work throughout the building, and have a setback that we need to open up.
1046 - Div. 1 - All searches are complete and negative. PWH - Duration 29 minutes.
1100 - Div. 1 - Under Control
Maybe:
E-26, 34, 1, 54, 65 s/c
L-21, 24, 4F, 12 s/c
B-7, 9
S-18
R-1
D-1
RAC-1
Fire in the 1st floor restaurant of a 4 story 25x50 brick mixed occupancy.
1022 - E-26 - Transmit the 10-75.
L-4 FAST
1024 - Bn. 7 - All Hands - Extra Engine and Truck (E-65, TL-12). Fire in the duct work.
1026 - Bn. 7 - 1 L/S/O, searches in progress. Advise TL-12 that they are needed for roof operations.
1030 - Bn. 7 - All visible fire is knocked down. Primaries are negative on the floors above. Checking for extension in the duct work of exposure 2. DWH
1035 - Bn. 7 - 2 L/S/O, we have a light smoke condition in exposure 2. Secondaries are complete and negative in the floors above and exposure 2.
1040 - Bn. 7 - This will be an extended operation. We have lots of overhaul, have to check the duct work throughout the building, and have a setback that we need to open up.
1046 - Div. 1 - All searches are complete and negative. PWH - Duration 29 minutes.
1100 - Div. 1 - Under Control
Maybe:
E-26, 34, 1, 54, 65 s/c
L-21, 24, 4F, 12 s/c
B-7, 9
S-18
R-1
D-1
RAC-1