11/29/2017 Queens All Hands Gas Main Break Box 7573

Joined
Oct 17, 2013
Messages
5,961
Location: 21 Avenue between 19 Street and Shore Boulevard (20-57 18 Street)

High pressure gas main ruptured at a construction site.

1331 - Bn. 49 - We have a gas main struck at a construction site. Using All Hands - DWH

L-154 FAST - E-307 3rd Engine - E-316 4th Engine

1335 - Bn. 49 - We have a high pressure gas main that was struck by a contractor. Con-Ed is on scene and trying to shut down the gas. One precautionary line stretched.

1341 - Bn. 49 - Con Ed is still trying to shut down the gas. We are searching surrounding properties. DWH

1347 - Bn. 49 - All surrounding properties check out. You can return the Squad and Rescue.

1349 - Div. 14 - Con Ed has been able to shut down the gas. Still DWH

1351 - Div. 14 - Con-Ed has isolated the leak. PWH - Duration 28 minutes.

1354 - Div. 14 - Under Control - Duration 31 minutes.

Maybe:
E-312, 263, 307, 316
L-117, 116, 154F
B-49, 45
S-288
R-4
D-14
RAC-4
 
Top