11/5/26 Brooklyn 3rd Alarm Box 2634

Joined
Sep 11, 2026
Messages
3
Fire Location: 653 58th Street @ 7th Ave
Size-up: 20x50 Class 3

BKD: Phone Alarm reporting fire in a PD @ 1:40
*Box Loaded due to calls

L109: Urgent: 10-75 @ 1:41

B40: All Hands on arrival @ 1:43

B40: Transmit the 2nd Alarm, Fire on all floors @ 1:46

B40: Fire on all floors of a 2 story, 2 L/S/O @ 1:47

B40: Water on the fire in the basement and the 1st floor @ 1:51

BKD: Staging 60th Street & 6th Avenue

B40: 10-45 NC x1 @ 1:51


D8: Make it x2 10-45s NC @ 1:57

D8: S/C 2 trucks (L157/L114, L172) @ 1:59

D8: AVFKD in the basement and first floor, primaries underway @ 2:03 (duration 24 mins)

D8: Transmit the 3rd Alarm, S/C 2 Trucks (L153/149, L175/147) @ 2:09

D8: 10-45 NC (total x3) @ 2:11

D8: x2 10-45 Code 1, x1 10-45 Code 2, x1 10-45 Code 3, x1 10-45 Code 4 (total x5) @ 2:17

D8: Primaries on all floors in progress, 5 L/S/O, AVFKD, searches being done in Exposures 2 & 4
x6 10-45s, now x2 10-45 Code 2s @ 2:22

FC: 10-2 the ARC (due to weather) @ 2:23

FC: S/C 2 trucks to command post (L119/L114, L111/172) @ 2:24

FC: Primaries in Exposures 2 & 4 negative @ 2:26 (duration 47 mins)

FC: Still hitting pockets of fire, PWH @ 2:38 (duration 59 mins)

FC: Secondaries in Exposures 2 & 4 negative @ 2:42

FC: Assign Hazmat Trio for E-Bike fire @ 2:44 (S252 HMTU)

Exposures:
1: Street
2: Similar attached
3: Rear yard
4: Similar attached

Rundown MAYBE
E201, 248, 241, 247AH
L114, 109, 148F, 149AH
B40, 48
R2
S1
D8
RAC3

2nd Alarm MAYBE
E282, 242, 250, 240
E284 w/ ST3
L147
B42FF, B32RUL, B33S
RB
SB
FC
RM
CTU2
TAC2

3rd Alarm MAYBE
E202 act. 201, 310 act. 282, 318 act. 242, 281, 279(comms)
L153 act. 149 s/c, L175 act. 147 s/c, L119 act. L114 s/c, L111 act. 172 s/c
B41FF
B31SAM
RAC1
C12, C23D
MSU
HM1
HMB
S252H

Relocations
E202/201
E318/242
E310/282
L153/149
L175/147

E321/284
E221/247
L119/114
L111/172

L170/114
L155/170
L20/147
E227/281
E236/242
E206/279
 
Last edited:
Back
Top