- Joined
- Oct 17, 2013
- Messages
- 5,961
Address: 2019 East 59 Street - between Avenue T & Avenue U
Fire in the basement of a 2 1/2 story 25x50 PD.
0450 - TL-159 - Transmit the 10-75. Fire in a semi-attached peaked roof.
TL-170 FAST - E-255 4th Engine
0456 - Bn. 58 - All Hands - Fire in the basement. 2 L/S, 1 L/O, searches in progress.
0457 - Bn. 58 - Extra Engine and Truck (E-257, L-156).
0501 - Bn. 58 - 3 L/S, 1 L/O, trucks opening up.
0508 - Div. 15 - Water on the fire in the basement. Heavy smoke condition on the upper floors. Primaries are complete and negative. DWH
0530 - Div. 15 - Secondaries are complete and negative throughout the fire building. Secondaries are in progress in exposure 4. Trucks continue to open up. DWH
0534 - Div. 15 - PWH - Duration 49 minutes.
0540 - Div. 15 - Corrected address on the fire building is 2019 East 59 Street. Under Control - Duration 55 minutes.
Maybe:
E-323, 309, 321, 255, 257 s/c
L-159, 157, 170F, 156 s/c
B-58, 33
S-252
R-2
D-15
RAC-2
Fire in the basement of a 2 1/2 story 25x50 PD.
0450 - TL-159 - Transmit the 10-75. Fire in a semi-attached peaked roof.
TL-170 FAST - E-255 4th Engine
0456 - Bn. 58 - All Hands - Fire in the basement. 2 L/S, 1 L/O, searches in progress.
0457 - Bn. 58 - Extra Engine and Truck (E-257, L-156).
0501 - Bn. 58 - 3 L/S, 1 L/O, trucks opening up.
0508 - Div. 15 - Water on the fire in the basement. Heavy smoke condition on the upper floors. Primaries are complete and negative. DWH
0530 - Div. 15 - Secondaries are complete and negative throughout the fire building. Secondaries are in progress in exposure 4. Trucks continue to open up. DWH
0534 - Div. 15 - PWH - Duration 49 minutes.
0540 - Div. 15 - Corrected address on the fire building is 2019 East 59 Street. Under Control - Duration 55 minutes.
Maybe:
E-323, 309, 321, 255, 257 s/c
L-159, 157, 170F, 156 s/c
B-58, 33
S-252
R-2
D-15
RAC-2