Address: 111 East 48 Street - between Park and Lexington Avenue
Fire on the 14th floor of a 15 story 200x200 hotel (under construction).
1408 - MD - Battalion 8, you have a 3x3 response, L-16 act. L-2 became available and was added. E-21 will be delayed.
1415 - Bn. 8 - Using 1x2, we had a small fire from welding on the 14th floor.
1421 - Bn. 8 - Using 2x2 for a small fire due to construction. Trucks are checking for extension.
1430 - Bn. 8 - All Hands - Under Control - 1 L/S/O, we had no extension to the 14th floor.
Assignment:
E-8, 21, 54
L-16 act. 2, 4, 7
B-8
Fire on the 14th floor of a 15 story 200x200 hotel (under construction).
1408 - MD - Battalion 8, you have a 3x3 response, L-16 act. L-2 became available and was added. E-21 will be delayed.
1415 - Bn. 8 - Using 1x2, we had a small fire from welding on the 14th floor.
1421 - Bn. 8 - Using 2x2 for a small fire due to construction. Trucks are checking for extension.
1430 - Bn. 8 - All Hands - Under Control - 1 L/S/O, we had no extension to the 14th floor.
Assignment:
E-8, 21, 54
L-16 act. 2, 4, 7
B-8