Address: 155-28 115 Avenue - between 155 & 157 Street
Fire throughout a 2 1/2 story 20x40 PD.
Reported fire out the windows of a PD.
0859 - L-133 - 10-75 the box. Fire on the 2nd floor.
L-126 FAST
0903 - TL-155 - "Urgent" - Transmit the 2nd Alarm.
0908 - Bn. 50 - We have a fully involved private dwelling. Extension to exposure 2. 3 L/S, 2 L/O, trucks opening up.
0910 - Bn. 50 - The exposure 2 is 155-34 115 Avenue.
0912 - Div. 13 - We are pulling all companies from the building and going to an exterior operation. Have Con-Ed respond ASAP. We have power lines about to burn off of the building.
0915 - Div. 13 - We have slight exterior extension to all exposures. 4 L/S/O, setting up a tower ladder. We are making progress.
0923 - Div. 13 - Roll call has been conducted and all units are accounted for. Tower Ladders are in operation. DWH
0935 - Div. 13 - AVFKD, shut down to Tower Ladder and looking for pockets of fire. Make this a 10-41 code, heavy fire upon arrival. Searches will be delayed. DWH
0946 - FC - This will be an extended operation. Secondaries are negative in exposures 2 & 4. Secondaries underway in a safe manner in the fire building. DWH
1003 - FC - Searches are being conducted floor by floor. This will be an extended operation. PWH - Duration1 hour 8 minutes.
1052 - FC - Secondaries are negative as much as was safe. Requesting an Engine for watch line (E-291), and then a watch line Engine every 3 hours.
Maybe:
E-275, 302, 303, 298
L-133, 155, 126F
B-50, 51
S-270
R-4
D-13
2nd Alarm:
E-308, 317, 311, 315
L-127, 165
B-54 FF, 39 RUL, 46 Safety
RB, SB, FC, FCB, Tac. 2, CTU, RAC-4
E-324 w/ Sat. 4
E-332 Communications
E-265 w/ Thawing Apparatus
Relocators:
E-293 act. E-302
E-307 act. E-298
E-227 act. E-308
E-326 act. E-303
E-313 act. E-317
L-129 act. L-133
B-18 act. B-50
B-53 act. B-54
Fire throughout a 2 1/2 story 20x40 PD.
Reported fire out the windows of a PD.
0859 - L-133 - 10-75 the box. Fire on the 2nd floor.
L-126 FAST
0903 - TL-155 - "Urgent" - Transmit the 2nd Alarm.
0908 - Bn. 50 - We have a fully involved private dwelling. Extension to exposure 2. 3 L/S, 2 L/O, trucks opening up.
0910 - Bn. 50 - The exposure 2 is 155-34 115 Avenue.
0912 - Div. 13 - We are pulling all companies from the building and going to an exterior operation. Have Con-Ed respond ASAP. We have power lines about to burn off of the building.
0915 - Div. 13 - We have slight exterior extension to all exposures. 4 L/S/O, setting up a tower ladder. We are making progress.
0923 - Div. 13 - Roll call has been conducted and all units are accounted for. Tower Ladders are in operation. DWH
0935 - Div. 13 - AVFKD, shut down to Tower Ladder and looking for pockets of fire. Make this a 10-41 code, heavy fire upon arrival. Searches will be delayed. DWH
0946 - FC - This will be an extended operation. Secondaries are negative in exposures 2 & 4. Secondaries underway in a safe manner in the fire building. DWH
1003 - FC - Searches are being conducted floor by floor. This will be an extended operation. PWH - Duration1 hour 8 minutes.
1052 - FC - Secondaries are negative as much as was safe. Requesting an Engine for watch line (E-291), and then a watch line Engine every 3 hours.
Maybe:
E-275, 302, 303, 298
L-133, 155, 126F
B-50, 51
S-270
R-4
D-13
2nd Alarm:
E-308, 317, 311, 315
L-127, 165
B-54 FF, 39 RUL, 46 Safety
RB, SB, FC, FCB, Tac. 2, CTU, RAC-4
E-324 w/ Sat. 4
E-332 Communications
E-265 w/ Thawing Apparatus
Relocators:
E-293 act. E-302
E-307 act. E-298
E-227 act. E-308
E-326 act. E-303
E-313 act. E-317
L-129 act. L-133
B-18 act. B-50
B-53 act. B-54