B47 gave 10-75 for high pressure gas main that was struck, checking the surrounding properties
D13 gave All Hands, (2) dry lines stretched, awaiting arrival of utilities
D13: Nat Grid supervisor on scene, awaiting arrival of work crew, conditions remain the same (55 min.)
D13: work crew now on scene, conditions are the same in all exposures (1 hr. 30 min.)
D13: Leak mitigated - UC (duration 2 hr.)
E246 act. E329
L158 act. L121
L143 act. L137
E304 act. E265
E285 act. E268
B54 act. B47