BEACH AVE at NORTH RAILROAD AVE
143 New Dorp Plaza
http://www.vpike.com/?place=143+New+Dorp+Plaza+Staten+Island+NY&submit=Street+View
Fire in a 2.5 story PD. Fire through the roof.
Report of a MAYDAY
Partial on Second:
E 167
E 166
E 152
L 82 acting 80
B 40 RUL
B 43 Safety
TAC 2
RB
SB
B 22 additional requested Chief by D 8
23:00 D 8 We had a roll call and all members are accounted for.
23:01 Fallback Step III has been instituted for SI
23:02 SID to D8 If staging required: New Dorp and 4th Street
23:08 D 8: We have all residents out of the fire building. 4 L/S/O. 1 TL in operation .We have conducted a roll call and all members are accounted for.
23:14 L 84 10-84 at the box
23:17 D 8 4 L/S/O. 1 TL in operation .We have conducted a roll call and all members are accounted for. DWH
23:18 D 8 requests an additional Tower Ladder. TL 77 S/C
23:21 D 8 requests TL 77 to set up on exposure 4.
23:22 SID requests exposures
23:24 D 8 We have a 2.5 story 20x50. 1. Street, 2. 2 story commercial separated by an 8' alley, 3. yard, 4. PD 2 story
23:30 D 8 requests TL 77 to come in off Richmond Road.
Report of roof collapse with most of second floor gone.
Transmissions are garbled and staticy
23:40 SID to D 8 I can't understand your message.
Duration: 1 hour and seven minutes
23:41 SID Let me see if I understand you. You are going to outside operation, and will later determine if you can go back in. Correct? D 8 Yes
23:46 D8 We are ?????????? operation
23:59 FC for D 8 PWH
Duration: 1 hour and 26 minutes
Some relocations:
E 279/160
E 242/163
B 48/22
E 243/158
B 42/23
143 New Dorp Plaza
http://www.vpike.com/?place=143+New+Dorp+Plaza+Staten+Island+NY&submit=Street+View
Fire in a 2.5 story PD. Fire through the roof.
Report of a MAYDAY
Partial on Second:
E 167
E 166
E 152
L 82 acting 80
B 40 RUL
B 43 Safety
TAC 2
RB
SB
B 22 additional requested Chief by D 8
23:00 D 8 We had a roll call and all members are accounted for.
23:01 Fallback Step III has been instituted for SI
23:02 SID to D8 If staging required: New Dorp and 4th Street
23:08 D 8: We have all residents out of the fire building. 4 L/S/O. 1 TL in operation .We have conducted a roll call and all members are accounted for.
23:14 L 84 10-84 at the box
23:17 D 8 4 L/S/O. 1 TL in operation .We have conducted a roll call and all members are accounted for. DWH
23:18 D 8 requests an additional Tower Ladder. TL 77 S/C
23:21 D 8 requests TL 77 to set up on exposure 4.
23:22 SID requests exposures
23:24 D 8 We have a 2.5 story 20x50. 1. Street, 2. 2 story commercial separated by an 8' alley, 3. yard, 4. PD 2 story
23:30 D 8 requests TL 77 to come in off Richmond Road.
Report of roof collapse with most of second floor gone.
Transmissions are garbled and staticy
23:40 SID to D 8 I can't understand your message.
Duration: 1 hour and seven minutes
23:41 SID Let me see if I understand you. You are going to outside operation, and will later determine if you can go back in. Correct? D 8 Yes
23:46 D8 We are ?????????? operation
23:59 FC for D 8 PWH
Duration: 1 hour and 26 minutes
Some relocations:
E 279/160
E 242/163
B 48/22
E 243/158
B 42/23