Address: 77-07 86 Street - between 77 & 78 Avenue
Fire on the 1st floor of a 2 story 20x40 PD (under construction).
1140 - Bn. 51 - We have a rubbish fire on the 1st floor. Stretching a line and checking for extension.
1143 - Bn. 51 - Transmit the 10-75.
L-151 FAST
1144 - Bn. 51 - Transmit the All Hands. We have a rubbish fire on the 1st floor with extension to the basement.
1148 - Bn. 51 - 2 L/S, 1 L/O, primaries are complete and negative.
1150 - Bn. 51 - PWH
1201 - Bn. 51 - Under Control - Duration 31 minutes.
Maybe:
E-319, 294, 293, 286
L-143, 135, 151F
B-51, 28
S-270
R-4
D-14
RAC-4
Fire on the 1st floor of a 2 story 20x40 PD (under construction).
1140 - Bn. 51 - We have a rubbish fire on the 1st floor. Stretching a line and checking for extension.
1143 - Bn. 51 - Transmit the 10-75.
L-151 FAST
1144 - Bn. 51 - Transmit the All Hands. We have a rubbish fire on the 1st floor with extension to the basement.
1148 - Bn. 51 - 2 L/S, 1 L/O, primaries are complete and negative.
1150 - Bn. 51 - PWH
1201 - Bn. 51 - Under Control - Duration 31 minutes.
Maybe:
E-319, 294, 293, 286
L-143, 135, 151F
B-51, 28
S-270
R-4
D-14
RAC-4