- Joined
- Oct 17, 2013
- Messages
- 5,961
Address: 365 Elton Street - between Pitkin and Glenmore Avenue
Fire on the 1st floor of a 2 story 20x40 PD.
1546 - Bn. 39 - Using 2x2 for an electrical fire in the walls. Stretching a line to the front door.
1548 - Bn. 39 - Give a 10-75 for a fire in the walls on the 1st floor. Send us an extra Engine and Truck for window bars (E-227, TL-120).
TL-107 FAST
1551 - Bn. 39 - All Hands - Fire on the 1st floor. 2 L/S, 1 L/O, primaries are in progress.
1554 - Bn. 39 - Water on the fire. Trucks are opening up.
1559 - Bn. 39 - Primaries are negative in the cellar, in progress on the 1st floor. PWH - Duration 20 minutes.
1605 - Div. 15 - Primaries are complete and negative. Secondaries are underway. Under Control - Duration 25 minutes.
Maybe:
E-332, 236, 290, 231, 227 s/c
L-175, 103, 107F, 120 s/c
B-39, 58
S-252
R-2
D-15
RAC-4
Fire on the 1st floor of a 2 story 20x40 PD.
1546 - Bn. 39 - Using 2x2 for an electrical fire in the walls. Stretching a line to the front door.
1548 - Bn. 39 - Give a 10-75 for a fire in the walls on the 1st floor. Send us an extra Engine and Truck for window bars (E-227, TL-120).
TL-107 FAST
1551 - Bn. 39 - All Hands - Fire on the 1st floor. 2 L/S, 1 L/O, primaries are in progress.
1554 - Bn. 39 - Water on the fire. Trucks are opening up.
1559 - Bn. 39 - Primaries are negative in the cellar, in progress on the 1st floor. PWH - Duration 20 minutes.
1605 - Div. 15 - Primaries are complete and negative. Secondaries are underway. Under Control - Duration 25 minutes.
Maybe:
E-332, 236, 290, 231, 227 s/c
L-175, 103, 107F, 120 s/c
B-39, 58
S-252
R-2
D-15
RAC-4
Last edited: