Address: 847 Jennings Street - at Stebbins Avenue
Fire on the 1st and 2nd floors of a 3 story 20x60 PD.
0755 - Bn. 26 - Using 2x2, investigating an overheated boiler. One precautionary line stretched.
0804 - Bn. 26 - Make this a 10-75 for fire on the 2nd floor.
TL-50 act. TL-58 FAST - E-90 4th Engine
0807 - Bn. 26 - Fire in a 1st floor boiler room with extension to the 2nd floor. 2 L/S, 1 L/O. DWH
0814 - Bn. 26 - Primaries are complete and negative throughout.
0818 - Div. 6 - Fire on the 1st floor with slight extension to the 2nd floor. 2 L/S/O, secondaries are underway, trucks opening up and checking for extension. DWH
0820 - Div. 6 - Secondaries are complete and negative. PWH - Duration 35 minutes.
Assignment:
E-40 act. 45, 3 act. 46, 287 act. 73, 90
L-16 act. 19, 126 act. 48, 50 act. 58F
B-26, 50 act. 18
S-41
R-3
D-6
RAC-3
Fire on the 1st and 2nd floors of a 3 story 20x60 PD.
0755 - Bn. 26 - Using 2x2, investigating an overheated boiler. One precautionary line stretched.
0804 - Bn. 26 - Make this a 10-75 for fire on the 2nd floor.
TL-50 act. TL-58 FAST - E-90 4th Engine
0807 - Bn. 26 - Fire in a 1st floor boiler room with extension to the 2nd floor. 2 L/S, 1 L/O. DWH
0814 - Bn. 26 - Primaries are complete and negative throughout.
0818 - Div. 6 - Fire on the 1st floor with slight extension to the 2nd floor. 2 L/S/O, secondaries are underway, trucks opening up and checking for extension. DWH
0820 - Div. 6 - Secondaries are complete and negative. PWH - Duration 35 minutes.
Assignment:
E-40 act. 45, 3 act. 46, 287 act. 73, 90
L-16 act. 19, 126 act. 48, 50 act. 58F
B-26, 50 act. 18
S-41
R-3
D-6
RAC-3