Bronx Box 2515 730 E165th St off Trinity Ave
Fire on the 14th Floor of a Multiple Dwelling
-B26 for Box 2515 we are using All Hands. We have fire in a Class 1 MD 50x50 isolated project. 1LSO from an upper floor. Fire is in the compactor room. We have multiple people outside because of the heavy smoke condition. We are Doubtful 12:55
-BD to B26...TL58 cannot respond, your new VSU is HRU2 with E39 transporting. Also, E46 is your new CFR Engine, replacing E45 12:56
-B26 Apartments 13B 14A 14H 14G all check out. Building is 14 stories 12:59
-B26 MBFKD we just have a few pockets on the upper floors in the shaft. We'll keep the CFRD and the FAST unit at this point. We're using the units we have on-scene for searches and venting 13:02
-D6 we need PD to the scene, we have a few doors on floors 13 and 14 that were forced. Apt 13F and the previous ones you sent on the MDT, we also checked and cleared 9A 13:09
-Via HT...?? to 92 and 50 you can stop the water, everything is out. We're going to take care of the fire on the 13 floor from the roof
-D6 all apartments check out. Additional fires were found on floor 14 and floor 8. Units are stretching lines up there no extension and Probably Will Holdl 13:22 37 mins
-D6 all fire has been extinguished. No extension. Primaries and secondaries are complete and negative. Under Control 13:29 44 mins
-D6 10-8 13:43
E50, E82?, E73, E92, E46CFR,
L19, L31, L44, L48, L27FAST,
B26, B17, B3, B18SO, SB, RB, D6
R3, Sq41, FC, RAC3, HR2/E39
Relocations
E79 acting E46
E263 acting E96
E91 acting E73
L32 acting L27
L13 acting L31
L154 acting L29
L26 acting L48
B11 acting B17
12/4/014
Fire on the 14th Floor of a Multiple Dwelling
-B26 for Box 2515 we are using All Hands. We have fire in a Class 1 MD 50x50 isolated project. 1LSO from an upper floor. Fire is in the compactor room. We have multiple people outside because of the heavy smoke condition. We are Doubtful 12:55
-BD to B26...TL58 cannot respond, your new VSU is HRU2 with E39 transporting. Also, E46 is your new CFR Engine, replacing E45 12:56
-B26 Apartments 13B 14A 14H 14G all check out. Building is 14 stories 12:59
-B26 MBFKD we just have a few pockets on the upper floors in the shaft. We'll keep the CFRD and the FAST unit at this point. We're using the units we have on-scene for searches and venting 13:02
-D6 we need PD to the scene, we have a few doors on floors 13 and 14 that were forced. Apt 13F and the previous ones you sent on the MDT, we also checked and cleared 9A 13:09
-Via HT...?? to 92 and 50 you can stop the water, everything is out. We're going to take care of the fire on the 13 floor from the roof
-D6 all apartments check out. Additional fires were found on floor 14 and floor 8. Units are stretching lines up there no extension and Probably Will Holdl 13:22 37 mins
-D6 all fire has been extinguished. No extension. Primaries and secondaries are complete and negative. Under Control 13:29 44 mins
-D6 10-8 13:43
E50, E82?, E73, E92, E46CFR,
L19, L31, L44, L48, L27FAST,
B26, B17, B3, B18SO, SB, RB, D6
R3, Sq41, FC, RAC3, HR2/E39
Relocations
E79 acting E46
E263 acting E96
E91 acting E73
L32 acting L27
L13 acting L31
L154 acting L29
L26 acting L48
B11 acting B17
12/4/014