- Joined
- Oct 17, 2013
- Messages
- 5,961
Address: 31 Lake Street - between Avenue S and Kings Highway
Fire on the 2nd floor of a 2 story 20x30 attached frame PD.
1206 - L-156 - Give a 10-75, still trying to locate it.
TL-161 FAST - E-254 4th Engine
1211 - Bn. 33 - All Hands - 2 L/S, 1 L/O, trucks opening up, searches in progress. Water on the fire, it's darkening down. DWH
1214 - Bn. 33 - Fire is on the 2nd floor. AVFKD.
1222 - Bn. 33 - Primaries are negative on the 1st floor, underway on the 2nd. PWH - Duration 21 minutes.
1234 - Div. 8 - Secondaries are negative in the basement and 1st floor, delayed on the 2nd floor due to excessive debris. Under Control - Duration 33 minutes.
1301 - Bn. 33 - Secondaries are complete throughout the fire building. We have (2) 10-45 code 4's.
Maybe:
E-330, 276, 253, 254
L-156, 153, 161F
B-33, 43
S-1
R-5
D-8
RAC-5
Fire on the 2nd floor of a 2 story 20x30 attached frame PD.
1206 - L-156 - Give a 10-75, still trying to locate it.
TL-161 FAST - E-254 4th Engine
1211 - Bn. 33 - All Hands - 2 L/S, 1 L/O, trucks opening up, searches in progress. Water on the fire, it's darkening down. DWH
1214 - Bn. 33 - Fire is on the 2nd floor. AVFKD.
1222 - Bn. 33 - Primaries are negative on the 1st floor, underway on the 2nd. PWH - Duration 21 minutes.
1234 - Div. 8 - Secondaries are negative in the basement and 1st floor, delayed on the 2nd floor due to excessive debris. Under Control - Duration 33 minutes.
1301 - Bn. 33 - Secondaries are complete throughout the fire building. We have (2) 10-45 code 4's.
Maybe:
E-330, 276, 253, 254
L-156, 153, 161F
B-33, 43
S-1
R-5
D-8
RAC-5