- Joined
- Oct 17, 2013
- Messages
- 5,962
Address: 90-30 52 Ave. between 90th and 92nd Streets
Fire in a 2 1/2 story 20x40 peaked roof PD.
E-287 transmitted the 10-75 for fire in a PD.
L-154 FAST
0716 - Bn. 46 - Using All Hands on Arrival. 1 L/S/O
0721 - Bn. 46 - Fire has taken off on the first floor, pulling units out at this time. DWH - Duration 10 minutes.
0723 - Div. 14 - Give me an extra Engine and Truck (E-316, TL-163).
0727 - Div. 14 - 3 L/S/O, fire in the basement and first floor. DWH - Duration 16 minutes.
0729 - Div. 14 - Transmit a 2nd Alarm - Fire is in the 2nd floor and attic.
0741 - Div. 14 - 4 L/S/O, still have visible fire on the 2nd floor. Duration 30 minutes.
0801 - FC - Per Div. 14 - Requesting 2 additional trucks (L-140, TL-135)
0820 - FC - Per Div. 14 - All visible fire knocked down, primaries are complete and negative in the basement and first floor, trucks opening up searching for pockets of fire. PWH - Duration 1 hour, 9 minutes.
0843 - Div. 14 - Primaries throughout are complete and negative, secondaries are delayed due to collyers mansion conditions. Under Control. Duration 1 hour 32 minutes.
All Hands Maybe:
E-287, 289, 324, 307, 316 s/c
L-136, 138, 154F, 163 s/c
B-46, 49
S-288
R-4
D-14
RAC-4
2nd Alarm:
E-319, 325, 305
L-151, 140 s/c, 135 s/c
B-45 Safety, 28 RUL, 52 FF
E-291 w/ Sat. 4
RB, SB, FC, Tac 1
Relocation:
L-173 act. L-136
TL-152 act. L-154
E-294 act. E-287
E-326 act. E-324
E-298 act. E-319
E-262 act. E-289
B-54 act. B-46
B-19 act. B-49
Fire in a 2 1/2 story 20x40 peaked roof PD.
E-287 transmitted the 10-75 for fire in a PD.
L-154 FAST
0716 - Bn. 46 - Using All Hands on Arrival. 1 L/S/O
0721 - Bn. 46 - Fire has taken off on the first floor, pulling units out at this time. DWH - Duration 10 minutes.
0723 - Div. 14 - Give me an extra Engine and Truck (E-316, TL-163).
0727 - Div. 14 - 3 L/S/O, fire in the basement and first floor. DWH - Duration 16 minutes.
0729 - Div. 14 - Transmit a 2nd Alarm - Fire is in the 2nd floor and attic.
0741 - Div. 14 - 4 L/S/O, still have visible fire on the 2nd floor. Duration 30 minutes.
0801 - FC - Per Div. 14 - Requesting 2 additional trucks (L-140, TL-135)
0820 - FC - Per Div. 14 - All visible fire knocked down, primaries are complete and negative in the basement and first floor, trucks opening up searching for pockets of fire. PWH - Duration 1 hour, 9 minutes.
0843 - Div. 14 - Primaries throughout are complete and negative, secondaries are delayed due to collyers mansion conditions. Under Control. Duration 1 hour 32 minutes.
All Hands Maybe:
E-287, 289, 324, 307, 316 s/c
L-136, 138, 154F, 163 s/c
B-46, 49
S-288
R-4
D-14
RAC-4
2nd Alarm:
E-319, 325, 305
L-151, 140 s/c, 135 s/c
B-45 Safety, 28 RUL, 52 FF
E-291 w/ Sat. 4
RB, SB, FC, Tac 1
Relocation:
L-173 act. L-136
TL-152 act. L-154
E-294 act. E-287
E-326 act. E-324
E-298 act. E-319
E-262 act. E-289
B-54 act. B-46
B-19 act. B-49