- Joined
- Apr 13, 2012
- Messages
- 9,116
2350 Ocean Avenue between Avenue R and Avenue S
BC33 to BK: 10-75 Box 3974, 11 story. Fire on the 2nd floor. 1 line in operation.
BC33 to BK: All visible fire has been KD. Secondaries in progress.
Div. 15 to BK: Placing this fire under control. We had to shut the gas off in the whole building, couldn’t find it for the apartment. 37 minute duration.
Probably:
E276, E254, E321, E246
L156, T153, T172F
RS02, SQ01
BC. 33, 42
Div. 15
*Trucks 10-84 are 156, 153 and 172. The 42 is also 10-84 maybe 10-75 chief*
BC33 to BK: 10-75 Box 3974, 11 story. Fire on the 2nd floor. 1 line in operation.
BC33 to BK: All visible fire has been KD. Secondaries in progress.
Div. 15 to BK: Placing this fire under control. We had to shut the gas off in the whole building, couldn’t find it for the apartment. 37 minute duration.
Probably:
E276, E254, E321, E246
L156, T153, T172F
RS02, SQ01
BC. 33, 42
Div. 15
*Trucks 10-84 are 156, 153 and 172. The 42 is also 10-84 maybe 10-75 chief*
Last edited: