Bronx Box 3202 565 Van Nest Ave
Multiple Dwelling fire on the Second and Third Floors
-D7 Second Alarm 22:24
-D7 2LS main body if fire has been KD. We have a little bit of fire in the cockloft and walls. Primaries are in progress, Doubtful 22:27 26 mins
-B18 have incoming units come in the wrong way down Van Nest 22:29
-D7 primaries in 2F and 3F are negative 22:30
-D7 all visible fire is KD. Trucks are still opening up in the cockloft. Doubtful 22:33 33 mins
-D7 Probably Will Hold. Releasing Rescue 22:35 35 mins
-D7 we have a line stretched to the roof, minor extension to the bulkhead. Primaries throughout the building are negative. Remain Doubtful. Return all special units that are not 10-84 22:41 41 mins
-D7 still overhauling the bulkhead, we had some extension and still extinguishing fire. Primaries on the 1,2,3 floors are negative 23:03 1 hour 3 mins
-D7 all secondaries are complete and negative. Fire is Under Control. Have DOB respond, the roof was cut and we want them to determine if it is habitable or not. Also have ConEd respond to cut the utilities to the building OEM and Red Cross are on the scene, 8 persons from the building displaced right now 23:10 1 hour 10 mins
Maybe:
Initial: E90, E45, E96, TL41, TL58, B18
All Hands: E64, L38FAST, B20, R3, Sq61, D7, RAC3
S/C: E82, L54
Second Alarm: E46, E42, E88, L47, B3SO, B26RUL, B19FF, RB, E72&SAT, TSU1,FC
Relocations:
E79 acting E90
E43 acting E45
E60 acting E42
L44 acting L58
B52 acting B20
3/5/2015
Multiple Dwelling fire on the Second and Third Floors
-D7 Second Alarm 22:24
-D7 2LS main body if fire has been KD. We have a little bit of fire in the cockloft and walls. Primaries are in progress, Doubtful 22:27 26 mins
-B18 have incoming units come in the wrong way down Van Nest 22:29
-D7 primaries in 2F and 3F are negative 22:30
-D7 all visible fire is KD. Trucks are still opening up in the cockloft. Doubtful 22:33 33 mins
-D7 Probably Will Hold. Releasing Rescue 22:35 35 mins
-D7 we have a line stretched to the roof, minor extension to the bulkhead. Primaries throughout the building are negative. Remain Doubtful. Return all special units that are not 10-84 22:41 41 mins
-D7 still overhauling the bulkhead, we had some extension and still extinguishing fire. Primaries on the 1,2,3 floors are negative 23:03 1 hour 3 mins
-D7 all secondaries are complete and negative. Fire is Under Control. Have DOB respond, the roof was cut and we want them to determine if it is habitable or not. Also have ConEd respond to cut the utilities to the building OEM and Red Cross are on the scene, 8 persons from the building displaced right now 23:10 1 hour 10 mins
Maybe:
Initial: E90, E45, E96, TL41, TL58, B18
All Hands: E64, L38FAST, B20, R3, Sq61, D7, RAC3
S/C: E82, L54
Second Alarm: E46, E42, E88, L47, B3SO, B26RUL, B19FF, RB, E72&SAT, TSU1,FC
Relocations:
E79 acting E90
E43 acting E45
E60 acting E42
L44 acting L58
B52 acting B20
3/5/2015