- Joined
- Aug 27, 2013
- Messages
- 810
Queens Box 2504 142-50 122 ave
-??? 10-75 Fire in a 2 story peaked roof PD
-L155 extra 1&1 17:13
-B51 All Hands 17:15
-E??? Let B51 know the Main body of fire is KD
-B51 All Hands for fire on the 2 floor. We have 2LSO, the searches are in progress and we are Doubtful and the exposures (1-street, 2-similar detached, 3-unknown, 4-similar detached)17:19 9 mins
-B51 primary on 1&2 floors negative 17:22
-D13 10-84 17:24
-D13 we are going Probably Will Hold and we are releasing R4 17:34 24 mins
-D13 secondary searches are complete and negative and we are Under Control. We are releasing L158 and Sq270 36 mins 17:45
-QD to D13 Buildings is giving a 1 hour ETA and D13 asking if a RAC was assigned 18:07
-QD to D13, E298 to await Buildings 18:10
-RAC4 10-8 nobody is here 18:46
-E298 still waiting for buildings 19:24
-E298 Buildings is on scene and we are 10-8c2 19:37
10-75, extra 1&1, AH, PWH, UC
10-75(E303, L158FAST, B50, R4, Sq270, D13, RAC4)
Extra 1&1(E311, L126)
E298
3/8/2014
-??? 10-75 Fire in a 2 story peaked roof PD
-L155 extra 1&1 17:13
-B51 All Hands 17:15
-E??? Let B51 know the Main body of fire is KD
-B51 All Hands for fire on the 2 floor. We have 2LSO, the searches are in progress and we are Doubtful and the exposures (1-street, 2-similar detached, 3-unknown, 4-similar detached)17:19 9 mins
-B51 primary on 1&2 floors negative 17:22
-D13 10-84 17:24
-D13 we are going Probably Will Hold and we are releasing R4 17:34 24 mins
-D13 secondary searches are complete and negative and we are Under Control. We are releasing L158 and Sq270 36 mins 17:45
-QD to D13 Buildings is giving a 1 hour ETA and D13 asking if a RAC was assigned 18:07
-QD to D13, E298 to await Buildings 18:10
-RAC4 10-8 nobody is here 18:46
-E298 still waiting for buildings 19:24
-E298 Buildings is on scene and we are 10-8c2 19:37
10-75, extra 1&1, AH, PWH, UC
10-75(E303, L158FAST, B50, R4, Sq270, D13, RAC4)
Extra 1&1(E311, L126)
E298
3/8/2014