- Joined
- Oct 17, 2013
- Messages
- 5,961
Address: 500 West 33 Street - between 10 & 11 Avenue
Dumpster fire on the 34th floor of a 34 story 500x500 building under construction.
1149 - E-34 - We have a dumpster fire on the 34th floor. The dumpster is only smouldering, however, we're going to need additional units.
1150 - E-26 - We're responding with 3 firefighters (Engine 3 added).
1200 - Bn. 9 - All Hands - We have water into the standpipe. We have to stretch a line from the 26th floor to the 34th floor.
L-4 FAST
1203 - Bn. 9 - We don't need additional units on scene. We'll hold with what we have on scene. DWH
1211 - Bn. 9 - There is no visible fire in the dumpster, we are still trying to get a line to it.
1217 - Bn. 9 - We have water on the fire. Duration 52 minutes.
1222 - Div. 1 - PWH - Duration 56 minutes.
1225 - Div. 1 - Under Control - Duration 59 minutes.
Assignment:
E-34, 26, 54, 3
L-21, 24, 4F
B-9, 8
S-18
R-1
D-1
RAC-1
Dumpster fire on the 34th floor of a 34 story 500x500 building under construction.
1149 - E-34 - We have a dumpster fire on the 34th floor. The dumpster is only smouldering, however, we're going to need additional units.
1150 - E-26 - We're responding with 3 firefighters (Engine 3 added).
1200 - Bn. 9 - All Hands - We have water into the standpipe. We have to stretch a line from the 26th floor to the 34th floor.
L-4 FAST
1203 - Bn. 9 - We don't need additional units on scene. We'll hold with what we have on scene. DWH
1211 - Bn. 9 - There is no visible fire in the dumpster, we are still trying to get a line to it.
1217 - Bn. 9 - We have water on the fire. Duration 52 minutes.
1222 - Div. 1 - PWH - Duration 56 minutes.
1225 - Div. 1 - Under Control - Duration 59 minutes.
Assignment:
E-34, 26, 54, 3
L-21, 24, 4F
B-9, 8
S-18
R-1
D-1
RAC-1