Address: 88-08 164 St. at Hillside Ave.
Struck Gas Line at a Construction SIte
1027 - E-315 - We have a gas main struck at a construction site. We need a priority response from Con-Ed.
1028 - Bn. 51 - Start out the 3rd Engine and Haz-Mat.
1031 - Bn. 51 - All Hands for a struck low pressure gas main.
L-125 FAST
1033 - Bn. 51 - We have located the leak and are attempting to shut it down. 1 precautionary line stretched. We are evacuating about 100 construction workers.
1043 - Bn. 51 - We have isolated the leak. Awaiting Con-Ed.
1112 - Bn. 51 - Going to drop down to 1x1 plus the FAST Truck and Haz-Mat.
1131 - Bn. 51 - National grid repair crew is on scene. Still holding units.
1136 - Bn. 51 - Under Control - Duration 1 hour 22 minutes.
Assignment (other activity in the area):
E-315, 305, 275, 299
L-133, 152, 125F
B-51, 50
S-270 Haz Tech
R-4
D-13
RAC 4
HM-1, HMB
Struck Gas Line at a Construction SIte
1027 - E-315 - We have a gas main struck at a construction site. We need a priority response from Con-Ed.
1028 - Bn. 51 - Start out the 3rd Engine and Haz-Mat.
1031 - Bn. 51 - All Hands for a struck low pressure gas main.
L-125 FAST
1033 - Bn. 51 - We have located the leak and are attempting to shut it down. 1 precautionary line stretched. We are evacuating about 100 construction workers.
1043 - Bn. 51 - We have isolated the leak. Awaiting Con-Ed.
1112 - Bn. 51 - Going to drop down to 1x1 plus the FAST Truck and Haz-Mat.
1131 - Bn. 51 - National grid repair crew is on scene. Still holding units.
1136 - Bn. 51 - Under Control - Duration 1 hour 22 minutes.
Assignment (other activity in the area):
E-315, 305, 275, 299
L-133, 152, 125F
B-51, 50
S-270 Haz Tech
R-4
D-13
RAC 4
HM-1, HMB