- Joined
- Aug 27, 2013
- Messages
- 810
Manhattan Box 0914 422 W57st off 9 ave
Reporting fire on the 5th floor 15:40
Receiving numerous calls giving 4th engine, R1 and Sq18 15:41
CIDS 5 story MD 30x80 class3 shelter soup kitchen 1st story setback connected to church exposure 2
-E23 10-75 for smoke from the basement windows 15:42
-B9 extra 1&1 (E8, L4) 15:42
-B9 going with the CIDS for sizeup and exposures(1-street, 2-highrise MD, 3-yard, 4-highrise MD) 15:44
-B9 transmit the Second Alarm we have water on the fire. Primaries are being conducted and the fire is in the front of the basement 15:48
-D3 we have 3LS (1 into the basement, 1 to the 1 floor, and 1 precautionary) request 2 extra trucks (L2, L16) to come to the CP. Primary searches are negative in the basement and 2,3,4,5 floors, just waiting on the 1 floor 16:03 24 mins
-D3 10-41c1 for a heavy body of fire on arrival 16:06 27 mins
-D3 have ConEd Gas and Electric respond here and the fire is still Doubtful 16:12 33 mins
-RAC1 10-84 16:14
-Car36B 10-84 16:14
-FC continuing to open up in the basement of the fire building as well as checking exposure 2 which is a church. Remain Doubtful 16:26 47 mins
-Sq18 10-8c2 16:28
-FC continuing to open up and primary searches throughout the fire building are negative. Also R1 RB SAT1/E9 are 10-8 16:29 50 mins
-FC request HM, HMB, and closest HMTU-Sq288 (E44 unavailable, on Box 7400) and contact us on the 800MHz Ch6B 16:44
-FC as per the HMB call a Decon Task Force, Decon Support, and the DSU 17:00
-FC all members removed from the basement awaiting HM and ? Probably Will Hold 17:02 1h 23 mins
10-75, 2 Alarm,
E23, B9,
E34, TL21FAST, R1, Sq18,
Extra 1&1-E8, L4
Second Alarm(E26, E65, E22, L25, B11SO, B7RUL, B6, Sat1/E9, RAC1, TSU1, SB, FC, RB, CTU)
Car36B
HM, HMB, Sq288
E81,
Relocations
Engine5 acting Engine8
Engine263 acting Engine23
Engine292 acting Engine26
Ladder138 acting Ladder35
Ladder15 acting Ladder21
Ladder110 acting L2
Ladder43 acting Ladder4
Battalion2 acting Battalion9
Battalion10 acting Battalion8
Battalion35 acting Battalion6
5/12/2014
Reporting fire on the 5th floor 15:40
Receiving numerous calls giving 4th engine, R1 and Sq18 15:41
CIDS 5 story MD 30x80 class3 shelter soup kitchen 1st story setback connected to church exposure 2
-E23 10-75 for smoke from the basement windows 15:42
-B9 extra 1&1 (E8, L4) 15:42
-B9 going with the CIDS for sizeup and exposures(1-street, 2-highrise MD, 3-yard, 4-highrise MD) 15:44
-B9 transmit the Second Alarm we have water on the fire. Primaries are being conducted and the fire is in the front of the basement 15:48
-D3 we have 3LS (1 into the basement, 1 to the 1 floor, and 1 precautionary) request 2 extra trucks (L2, L16) to come to the CP. Primary searches are negative in the basement and 2,3,4,5 floors, just waiting on the 1 floor 16:03 24 mins
-D3 10-41c1 for a heavy body of fire on arrival 16:06 27 mins
-D3 have ConEd Gas and Electric respond here and the fire is still Doubtful 16:12 33 mins
-RAC1 10-84 16:14
-Car36B 10-84 16:14
-FC continuing to open up in the basement of the fire building as well as checking exposure 2 which is a church. Remain Doubtful 16:26 47 mins
-Sq18 10-8c2 16:28
-FC continuing to open up and primary searches throughout the fire building are negative. Also R1 RB SAT1/E9 are 10-8 16:29 50 mins
-FC request HM, HMB, and closest HMTU-Sq288 (E44 unavailable, on Box 7400) and contact us on the 800MHz Ch6B 16:44
-FC as per the HMB call a Decon Task Force, Decon Support, and the DSU 17:00
-FC all members removed from the basement awaiting HM and ? Probably Will Hold 17:02 1h 23 mins
10-75, 2 Alarm,
E23, B9,
E34, TL21FAST, R1, Sq18,
Extra 1&1-E8, L4
Second Alarm(E26, E65, E22, L25, B11SO, B7RUL, B6, Sat1/E9, RAC1, TSU1, SB, FC, RB, CTU)
Car36B
HM, HMB, Sq288
E81,
Relocations
Engine5 acting Engine8
Engine263 acting Engine23
Engine292 acting Engine26
Ladder138 acting Ladder35
Ladder15 acting Ladder21
Ladder110 acting L2
Ladder43 acting Ladder4
Battalion2 acting Battalion9
Battalion10 acting Battalion8
Battalion35 acting Battalion6
5/12/2014