6/11/2015 Manhattan All Hands Box 0793

Joined
Oct 17, 2013
Messages
5,962
Address: 420 Lexington Ave. between East 43 & East 44 Street

Electrical fire on a setback roof of a 32 story 100x100 office building.

*Two separate boxes were sent to what turned out to be one fire.  Box #0789 was the first box that went out and Box #0793 was second.  This rundown reflects both boxes.  It sounded as if most (if not all) companies from the first box remained on scene after Battalion 8 transmitted the 10-18. 

2025 - E-8 - Using 1x2 investigating an electrical fire on the 19th floor.  This may be related to the 9th Battalion box.

2029 - Bn. 8 - Make Box #0789 a 10-18 for a 10-31.  Please assign TL-7 to the other box.

2039 - Bn. 9 - We had some overheated feeder cables going to the water tower on the roof.  Units venting at this time.

2042 - Bn. 9 - All Hands for an electrical condition in the conduit from the top floor to the roof.  Stretching a line now.  DWH

L-3 FAST  -  E-21 4th Engine

2048 - Bn. 9 - We have fire on the setback between the 7th and 8th floor.  Engine 65 has a lines stretched and is pouring water onto it now.

Box #0789:
E-8, 21, 65
L-2, 7
B-8

Box #0793
E-16, 26, 54
L-4, 3F
B-9
S-18
R-1
D-3
RAC-1
 
Joined
Jan 20, 2014
Messages
17,047
A couple minutes before this there was a water resuce

Battery Pl & 3 St

Divers being deployed.

Maybe R1 & Sq18 were tied up there?
 
Joined
Oct 17, 2013
Messages
5,962
I updated the post (sorry for the delay). 

Engine 8 was on scene.

The water rescue was in progress at the onset of this incident, however, units were available by the time the All Hands was transmitted, 25 minutes later.

 