*Delayed Post
Address: 429 West 58 Street - between 10 & 9 Avenue
Fire on the roof of a 2nd floor setback of a 12 story 50x200 hospital.
1815 - Bn. 9 - Using 2x2. There were construction workers on the roof of the 2nd floor setback that caused a fire by the vent duct. 1 L/S.
1833 - Bn. 9 - Fire is knocked down. At this time, we are checking the building.
1847 - Bn. 9 - All Hands - Under Control - Duration 1 hour 7 minutes.
Maybe:
E-40, 54, 23
L-35, 4
B-9
R-1
Address: 429 West 58 Street - between 10 & 9 Avenue
Fire on the roof of a 2nd floor setback of a 12 story 50x200 hospital.
1815 - Bn. 9 - Using 2x2. There were construction workers on the roof of the 2nd floor setback that caused a fire by the vent duct. 1 L/S.
1833 - Bn. 9 - Fire is knocked down. At this time, we are checking the building.
1847 - Bn. 9 - All Hands - Under Control - Duration 1 hour 7 minutes.