7/27/2010 Manhattan Box 1247 Technical Rescue

Joined
Nov 7, 2009
Messages
366
Address: 232 E 97th St

Scaffolding Collapse on to a contrustion working, also have asbestos in the building

Size up  40 Story MD 25 X 60

E-53,22,58
L-43,13,14(Soc Support Truck)
B-10
R-1
D-3
Sq-41
L-25 w/ C.R 1
RB

Haz-Mat 1 E-44 and Haz-Mat Battalion S/C

Engine 44 needed to Deacon the victim @ 15:51
 
Joined
Apr 1, 2007
Messages
3,991
Yeah . . . on the scalfolding on the contrustion working.  Somebody needs to figure out where the spell check button is, never mind the grammar.
 
Joined
Aug 9, 2008
Messages
1,177
Engines: 53,22,58
Ladders: 13,14(SSL) 43
BN: 10
Rescue 1, SB, RB, Tac-1.
L-25/RC-1
SQ-41
Haz Mat, HMB, E-44(Haz Mat Tech)
Div-3

1541 Bn-10 reports hoistway collapsed, one person pinned.
1547 Div-3 rpts, using 2x2 setting up Sq-41 for Decon, integrity of building is ok.
1555 Victim removed, decon is set up, pri srch negative.
1630 FF's and EMS being deconned.
 
Top