Address: 100 East End Avenue at East 84 Street
Fire on the 3rd floor of an 8 story 125x75 school (The Chapin School).
1426 - Bn. 10 - Using 2x2 for a small fire on the 3rd floor. 1 L/S, Trucks opening up.
1428 - Bn. 10 - Go with the 10-75. We have smoke increasing in the utility shaft. Searching for the seat of the fire.
L-43 FAST
1433 - Bn. 10 - All Hands - 1 L/S/O, Engine 39 is hooking up to the standpipe and stretching a line to the floor above.
1442 - Bn. 10 - We have water on the fire in the pipe chase on the 3rd floor. Trucks continue to open up. DWH
1446 - Div. 3 - Fire is knocked down, primaries are complete and negative throughout, all workers are accounted for.
1449 - Div. 3 - Secondaries in progress. PWH - Duration 36 minutes.
1455 - Div. 3 - Secondaries are negative. Under Control - Duration 41 minutes.
Assignment:
E-22, 44, 39, 53
L-13, 16, 43F
B-10, 8
S-288
R-1
D-3
RAC-1, CTU
Fire on the 3rd floor of an 8 story 125x75 school (The Chapin School).
1426 - Bn. 10 - Using 2x2 for a small fire on the 3rd floor. 1 L/S, Trucks opening up.
1428 - Bn. 10 - Go with the 10-75. We have smoke increasing in the utility shaft. Searching for the seat of the fire.
L-43 FAST
1433 - Bn. 10 - All Hands - 1 L/S/O, Engine 39 is hooking up to the standpipe and stretching a line to the floor above.
1442 - Bn. 10 - We have water on the fire in the pipe chase on the 3rd floor. Trucks continue to open up. DWH
1446 - Div. 3 - Fire is knocked down, primaries are complete and negative throughout, all workers are accounted for.
1449 - Div. 3 - Secondaries in progress. PWH - Duration 36 minutes.
1455 - Div. 3 - Secondaries are negative. Under Control - Duration 41 minutes.
Assignment:
E-22, 44, 39, 53
L-13, 16, 43F
B-10, 8
S-288
R-1
D-3
RAC-1, CTU