@1354: 10-75-1580 by Batty. 41 for fire in a 2 story PD at 237 East 38th Street, near Church Avenue, Flatbush Section of Brooklyn.
Should be: Engines 248, 249,, 310 Ladders 113, 174, 157 Batt. 41
Engine 281(4th due), Ladder 147 (fast truck), Squad 1, Rescue 2, Batt. 38
@1358: Batt. 41: using 2 and 2 for a mattress fire on the second floor.
@1358: Batt. 41: fire is probably will hold, return all special units; fire building is 2 brick 20 x 80 with commercial on the first floor. Squad 1, Rescue 2, and Ladder 147 are 10-8.
@1401: 75-1580: Batt. 41 reports using all hands, fire is under control.
Should be: Engines 248, 249,, 310 Ladders 113, 174, 157 Batt. 41
Engine 281(4th due), Ladder 147 (fast truck), Squad 1, Rescue 2, Batt. 38
@1358: Batt. 41: using 2 and 2 for a mattress fire on the second floor.
@1358: Batt. 41: fire is probably will hold, return all special units; fire building is 2 brick 20 x 80 with commercial on the first floor. Squad 1, Rescue 2, and Ladder 147 are 10-8.
@1401: 75-1580: Batt. 41 reports using all hands, fire is under control.