Address: 728 East New York Ave./Albany Ave. to Troy Ave.

Maybe,
E249, 234, 310, 248
L113, 123, 174F
B38, 41
S1
R2
D15

E249 responded initially for wires down

E249: we have a live wire on a car

E249: multiple wires are arcing, have a BC & Ladder respond (B38/L113)

E249: fill out the Box, the entire block is arcing with embers falling everywhere

BklynD: now have a report of wires burning at PS 391

B38: have ConEd respond

B38: (2) precautionary lines stretched, we have wires down & on fire, using All Hands

L174F

B38: no need for S1 & R2

B38: we have (2) precautionary L/S, operating at times - power outages at 764 & 766 East New York Ave.

B38: stretching a 3rd line, some fire going down the block at the poles, using the line intermittently

D15: wires burning on East New York Ave./Schenectady Ave. to Albany Ave. - (3) L/S & operating intermittently, surrounding structures are being searched, no CO nor extension, awaiting arrival of ConEd

D15: ConEd on scene, removing power, all HLs shutdown

D15: UC (duration 2 hr.)

E219 act. E249
L112 act. L113
L166 act. L174
 
Last edited:
Joined
Jan 16, 2009
Messages
2,609
Address: 728 East New York Ave./Albany Ave. to Troy Ave.

Maybe,
E249, 234, 310, 248
L113, 123, 174F
B38, 41
S1
R2
D15

E249 responded initially for wires down

E249: we have a live wire on a car

E249: multiple wires are arcing, have a BC & Ladder respond (B38/L113)

E249: fill out the Box, the entire block is arcing with embers falling everywhere

BklynD: now have a report of wires burning at PS 391

B38: have ConEd respond

B38: (2) precautionary lines stretched, we have wires down & on fire, using All Hands

L174F

B38: no need for S1 & R2

B38: we have (2) precautionary L/S, operating at times - power outages at 764 & 766 East New York Ave.

B38: stretching a 3rd line, some fire going down the block at the poles, using the line intermittently

D15: wires burning on East New York Ave./Schenectady Ave. to Albany Ave. - (3) L/S & operating intermittently, surrounding structures are being searched, no CO nor extension, awaiting arrival of ConEd

D15: ConEd on scene, removing power, all HLs shutdown

D15: UC (duration 2 hr.)

E219 act. E249
L112 act. L113
L166 act. L174
248 contuines to catch work in Flatbush
 