- Joined
- Apr 13, 2012
- Messages
- 9,383
23-30 128 Street - between 23 and 25 Avenue - College Point
Fire in a PD
TL144 FAST
E273: 10-75 the box.
BC52: Using AH. Fire on 2nd floor of 2-story 40x60 PD. 2LS, 1LO.
BC52: Extra engine and truck (E297, L167)
E297: We’re available from previous box (normally first due)
QNS to E297: 10-4, you’re the extra engine above the AH.
Div. 14: Still have heavy fire on 2nd floor. 3LS, 2LO.
Div. 14: MBFKD. Trucks checking for extension. DWH.
Probably:
E273, E295, E274, E320, E297
L130, L129, T144F, L167
RS04, SQ288
BC. 52, 46
Div. 14
Fire in a PD
TL144 FAST
E273: 10-75 the box.
BC52: Using AH. Fire on 2nd floor of 2-story 40x60 PD. 2LS, 1LO.
BC52: Extra engine and truck (E297, L167)
E297: We’re available from previous box (normally first due)
QNS to E297: 10-4, you’re the extra engine above the AH.
Div. 14: Still have heavy fire on 2nd floor. 3LS, 2LO.
Div. 14: MBFKD. Trucks checking for extension. DWH.
Probably:
E273, E295, E274, E320, E297
L130, L129, T144F, L167
RS04, SQ288
BC. 52, 46
Div. 14
Last edited: