8/8/2014 Queens All Hands Box 5675

Joined
Oct 17, 2013
Messages
5,962
Address: 104-20 209 Street between 104 Ave & 109 Ave

Fire on the 2nd floor of a 2 story 20x40 peaked roof PD.

1327 - E-301 transmitted the 10-75.

L-133 FAST

1328 - QD - Reports of people still in the building.

1331 - Bn. 54 - All Hands - Heavy fire on the 2nd floor.  2 L/S, 1 L/O, searches in progress, trucks opening up.  Window bars, requesting an Extra Engine and Truck (E-326, TL-127). 

1333 - Bn. 54 - Water on the fire, primaries are negative in the basement and 1st floor. DWH

1338 - Bn. 54 - (2) 10-45 code 4's.

1340 - Bn. 54 - MBFKD, Checking for extension in the attic.

1344 - Div. 13 - All visible fire is knocked down.  Secondary searches are underway.  DWH - Duration 20 minutes

1359 - Div. 13 - Secondaries delayed due to Collyer's Mansion conditions.  Under Control.

Maybe:
E-301, 304, 317, 275, 326 s/c
L-150, 162, 133F, 127 s/c
B-54, 53
S-270
R-4
D-13
RAC-4
 
Top