Manhattan Box 0525 (probably 828 Broadway, Strand Bookstore)
-MD to B6 we are getting reports of people ill and pepper spray was used, do you want a HazMat response? (B6 Not ATT, we are investigating) 16:09?
-B6 have HazMat respond and the other units come in emergency mode. We have numerous people coughing and saying some type of pepper spray was sprayed in the bookstore 16:12
-B6 we are still investigating ATT and start out EMS (they were notified) 16:18
-B6 we are using 2&2 ATT. Building is a 9?-story 50x100? MD. We had people overcome with coughing and irritaion to the eyes. The HVAC system has been shut down to the 1-floor 17:07
-B6 we have squad inside checking with meters. We are awaiting EMS and HazMat. People are outside who were overcome and seem to feel a little bit better, some are beginning to leave the scene 16:27
-D1 EMS and HM1 10-84, nobody requesting EMS attention. We are still investigating and holding the current assignment 16:31
-D1 using 1&1 and special units, everyone else can go 10-8. The basement,1,2,&3-floors have been evacuated. HM1 is checking all floors for contaminants. We have no patients right now, EMS is on-scene and nobody came up to them 16:43
-D1 HM1 has completed their walkthrough. We are turning the HVAC system back on and will be doing another walkthrough. We are currently waiting for the results of that 16:50
-D1 10-80c1. HM1 will be making all notifications.All units 10-8 when available 16:57
-HM1 10-8, leaving your frequency 17:20
E14?, E5, E33, L3?, TL9, B6, D1
Sq18, HM1, HMB
9/16/2014
-MD to B6 we are getting reports of people ill and pepper spray was used, do you want a HazMat response? (B6 Not ATT, we are investigating) 16:09?
-B6 have HazMat respond and the other units come in emergency mode. We have numerous people coughing and saying some type of pepper spray was sprayed in the bookstore 16:12
-B6 we are still investigating ATT and start out EMS (they were notified) 16:18
-B6 we are using 2&2 ATT. Building is a 9?-story 50x100? MD. We had people overcome with coughing and irritaion to the eyes. The HVAC system has been shut down to the 1-floor 17:07
-B6 we have squad inside checking with meters. We are awaiting EMS and HazMat. People are outside who were overcome and seem to feel a little bit better, some are beginning to leave the scene 16:27
-D1 EMS and HM1 10-84, nobody requesting EMS attention. We are still investigating and holding the current assignment 16:31
-D1 using 1&1 and special units, everyone else can go 10-8. The basement,1,2,&3-floors have been evacuated. HM1 is checking all floors for contaminants. We have no patients right now, EMS is on-scene and nobody came up to them 16:43
-D1 HM1 has completed their walkthrough. We are turning the HVAC system back on and will be doing another walkthrough. We are currently waiting for the results of that 16:50
-D1 10-80c1. HM1 will be making all notifications.All units 10-8 when available 16:57
-HM1 10-8, leaving your frequency 17:20
E14?, E5, E33, L3?, TL9, B6, D1
Sq18, HM1, HMB