Address: 874 East 139 Street - at Walnut Avenue
Fire on the 1st floor of a 1 story brick 200x300 factory.
Box was loaded up due to volume of calls.
0649 - E-73 - 10-75 the box.
L-55 FAST - E-94 4th Engine
0653 - Bn. 14 - All Hands - Fire in the ductwork on the 1st floor that started in the boiler. 1 L/S, primaries in progress.
0703 - Div. 6 - 2 L/S/O, fire started in a commercial dryer and spread to the ductwork and roofing materials. DWH
0711 - Div. 6 - Primaries are complete and negative. Special call an additional Truck (L-29).
0719 - Div. 6 - The fire started in the boiler, not a dryer. Due to the steam pressure in the boiler, we are holding off putting water in the ductwork at this time.
0736 - Div. 6 - Secondaries are negative on the 1st floor, all fire is knocked down, trucks checking for extension. Under Control
Maybe:
E-73, 60, 71, 94
L-42, 17, 55F, 29 s/c
B-14, 3
S-41
R-3
D-6
RAC-3
*Not sure where 83/29 were.
Fire on the 1st floor of a 1 story brick 200x300 factory.
Box was loaded up due to volume of calls.
0649 - E-73 - 10-75 the box.
L-55 FAST - E-94 4th Engine
0653 - Bn. 14 - All Hands - Fire in the ductwork on the 1st floor that started in the boiler. 1 L/S, primaries in progress.
0703 - Div. 6 - 2 L/S/O, fire started in a commercial dryer and spread to the ductwork and roofing materials. DWH
0711 - Div. 6 - Primaries are complete and negative. Special call an additional Truck (L-29).
0719 - Div. 6 - The fire started in the boiler, not a dryer. Due to the steam pressure in the boiler, we are holding off putting water in the ductwork at this time.
0736 - Div. 6 - Secondaries are negative on the 1st floor, all fire is knocked down, trucks checking for extension. Under Control