Fire Location: 1141 39th Street
Boxed loaded up due to calls
B-48: 10-75, Building material on fire inside the building @ 13:40
L-147 FAST
B-40: Requesting PD for traffic control @ 13:47
B-48: 2L/S 1/O, Fire top floor bulkhead of the MD under construction @ 13:48
B-48: PWH @ 13:52
Duration 15 Mins
B-48: Under Control @ 14:00
Duration 25 Mins
Rundown:
E-282, 240, 247, 228, 281
L-148, 114, 147F, 122
B-48, 40
R-2
SQ-1
D-11
RAC 5
Boxed loaded up due to calls
B-48: 10-75, Building material on fire inside the building @ 13:40
L-147 FAST
B-40: Requesting PD for traffic control @ 13:47
B-48: 2L/S 1/O, Fire top floor bulkhead of the MD under construction @ 13:48
B-48: PWH @ 13:52
Duration 15 Mins
B-48: Under Control @ 14:00
Duration 25 Mins
Rundown:
E-282, 240, 247, 228, 281
L-148, 114, 147F, 122
B-48, 40
R-2
SQ-1
D-11
RAC 5