8/27/25 Brooklyn Haz-Mat Box 2695

Joined
Jan 20, 2014
Messages
18,472
Location: 4802 FT Hamilton Pkwy

Chemical Spill in the Hospital

E-282,247,246,228,240
E-250 w/ 2nd Piece
L-156 Act. 148,114,148(Fast),147
L-157 w/ 2nd Piece
L-132(Soc Support)
B-40*,48
R-2
Sq-1
D-8
Rac-5s/c
HM-1
HMB

*ABC

Decon Task Force
E-279
L-131
B-32*
Decontamination Support Unit 1

*ABC

All Hands
 
Last edited:
Location: 4802 FT Hamilton Pkwy

Chemical Spill in the Hospital

E-282,247,246,228,240
E-250 w/ 2nd Piece
L-156 Act. ??,114,148(Fast),147
L-157 w/ 2nd Piece
B-40*,48
R-2
Sq-1
D-8
Rac-5
HM-1
HMB

*ABC

Decon Task Force
E-279
L-131
B-32*

*ABC

All Hands
148 usually 1st due at MMC.
 
Location: 4802 FT Hamilton Pkwy

Chemical Spill in the Hospital

E-282,247,246,228,240
E-250 w/ 2nd Piece
L-156 Act. ??,114,148(Fast),147
L-157 w/ 2nd Piece
B-40*,48
R-2
Sq-1
D-8
Rac-5
HM-1
HMB

*ABC

Decon Task Force
E-279
L-131
B-32*

*ABC

All Hands
Phone Alarm Reporting Smoke In The Emergency Room (4&2 On Initial, E246 act. E282 In The Area).

B40: Transmit The 10-80 Code 1, Possible Chlorine Or Ammonia Leak - 11:15.

B40: E250 Is Metering The Emergency Room, Holding All Units Awaiting The Arrival Of HM01 & HB01 - 11:42.

B40: s/c (1) Decon Engine (E279) & (1) SOC Support Truck (L132) - 11:48.

BK/B40: TL157 CPC Unit, TL131 & B32 On The Decon Task Force Also Assigned - 11:52.

Sounds Like Decontamination Support Unit 1 Also Assigned.

B40: s/c (1) RAC Unit (RA05) - 12:42.

B40: Transmit The All Hands, Still Trying To Mitigate The Leak - 12:48.

B40: 9-Story 300x300 Hospital, All Exposures Are Streets - 13:05.

D8: Sealing The Room On The 9th Floor Which Contained The Leak, No Patients & No Readings. DWH - 13:33.

D8: Under Control Via Cellphone.

Relocations:
E243 act. E282
E248 act. E247
L102 act. L148
TL120 act. TL157
TL18 act. TL131
B38 act. B48
 
Last edited:
I thought I saw on this site that the CPC units were discontinued as well as some SOC Support Ladders?
 
Back
Top