7/16/26 Brooklyn 10-60 Box 2683

Joined
Jan 20, 2014
Messages
20,773
Location: 520 50th St

Partial wall collapse

2 story 25 X 100 under construction

B-48 All Hands. Wall collapse exposure 4

E-201,228,282,241,242
E-279(Comm)
E-250 w/ 2nd Piece
E-227 w/ R.C 2
L-114,109,149(Fast),147
B-48,42
B-32(RUL)*
B-41(Safety)
R-5,2
Sq-1,252
D-8
Rac-5
RB,SB
FC
Tac-2
HM-1
HMB
SOC Logistics
SOC Compressor
K9-01

*ABC
 
Last edited:
Location: 520 50th St

Partial wall collapse

2 story 25 X 100 under construction

B-48 All Hands. Wall collapse exposure 4

E-201,228,282,241,242
E-279(Comm)
E-250 w/ 2nd Piece
E-227 w/ R.C 2
L-114,109,149(Fast),147
B-48,42
B-32(RUL)*
B-41(Safety)
R-5,2
Sq-1,252
D-8
Rac-5
RB,SB
FC
Tac-2
HM-1
HMB
SOC Logistics
SOC Compressor
K9-01

*ABC
L148 10-84
 
Back
Top