- Joined
- Aug 5, 2015
- Messages
- 4,241
Address: 91-36 80th St. off Atlantic Ave.
Fire on the 2nd floor of a 2 story 20x40 PD
Initial box for wires down on the block
E-293: Transmit our box - Smoke coming from the 2nd floor of 91-36 80 St. - 16:14
Box loaded up based on that report.
B-39: 10-75 - All Hands - 16:25
B-39: Fire on the 2nd floor - 1 L/S/O - 16:28
B-39: Extra E&T (E-308 & L-175) - 16:30
D-13: 3 L/S, 2 L/O - Slight extension to exposure 2 - DWH - 16:44
D-13: Can we have 1 extra truck (L-165 act. 143) - 16:49
D-13: PWH - 17:09
D-13: Under Control - 17:10
Duration: 1 Hour & 16 Min.
Maybe:
E-293, 285, 236, 294, 225, 308 s/c
L-142, 143, 135F, 107, 175 s/c, 165 (act. 143) s/c
B-39, 51
R-4
SQ-270
D-13
RAC-4
Relocations:
E-311 to E-293
E-319 to E-308
L-165 to L-143
L-124 to L-107
L-117 to L-142
L-115 to L-135
Fire on the 2nd floor of a 2 story 20x40 PD
Initial box for wires down on the block
E-293: Transmit our box - Smoke coming from the 2nd floor of 91-36 80 St. - 16:14
Box loaded up based on that report.
B-39: 10-75 - All Hands - 16:25
B-39: Fire on the 2nd floor - 1 L/S/O - 16:28
B-39: Extra E&T (E-308 & L-175) - 16:30
D-13: 3 L/S, 2 L/O - Slight extension to exposure 2 - DWH - 16:44
D-13: Can we have 1 extra truck (L-165 act. 143) - 16:49
D-13: PWH - 17:09
D-13: Under Control - 17:10
Duration: 1 Hour & 16 Min.
Maybe:
E-293, 285, 236, 294, 225, 308 s/c
L-142, 143, 135F, 107, 175 s/c, 165 (act. 143) s/c
B-39, 51
R-4
SQ-270
D-13
RAC-4
Relocations:
E-311 to E-293
E-319 to E-308
L-124 to L-107
L-117 to L-142
L-115 to L-135
Last edited: