- Joined
- May 17, 2011
- Messages
- 334
Box 3956
297 Lenox Road
Report of Crane Hitting Building
12:25 BD to B-41 we are giving you a Major Tactical Response - Reports of Crane hitting building and ceilings coming down inside several apartments.
12:26 L-113: Payload hit side of building - No visible damage at this time - Going inside to check on repots of ceiling collapse
12:31 B-41: Keep resources coming in - We do have structural damage - a crack from parapet down to ground on exterior of building - Evacuations of A Line and Building are underway.
Possible partial list so far -
E-248, 249, 255
L-113, 147
B-41,
S-1
R-2
D-15
L-132 SOC Support Truck also transported RC-2
L-170 SOC Support Truck
R-5
FC
RB
SB
SOC - Compressor
SOC - Logistics
Car 10
COMMAND TAC
RAC-2
TAC-2
12:38 B-41: BD can you get an ETA on Buildings with a rush.
12:39 BD to B-41: OEM and Buildings are responding.
12:46 FC: Can you put a priority call in for the utilities, also OEM to respond and updated ETA for Buildings.
12:53 FC: Using All Hands - Structural integrity has been compromised on 6-story 100x200 H-type on Front Exposure 4 side wing - Crack runs from base to roof. Still waiting on Utilities, DOB, and OEM.
BD to FC: OEM has crew enroute, DOB states 30 minutes, contacting Utilities
13:14 FC per D-15: Primaries are Negative Throughout - Waiting for DOB - FC going 10-8 - numerous other SOC units went 10-8
13:27 D-15: PWH releasing E-249, E-255, and L-147
13:35 D-15: Do we have an ETA on Buildings
13:38 D-15: We get that ETA yet? BD: They are going to give us a call back.
13:39 BD to D-15: Buildings is giving an ETA of 15-20 minutes
13:45 D-15: Evacuating Exposure 4-A as a precaution.
13:49 D-15: Do you have ETA on TAC-2. TAC-2: 5 Minutes out.
13:50 D-15: Can you have a transit authority respond to the command post in reference tot he subway that runs along Nostrand.
13:53 D-15: Can you have the Communications Engine report to command post. Also the 2 and 5 lines that run along Nostrand need to be shut down
S/C E-332-Comm
14:32 D-15: Requesting 2 Trucks for relief.
S/C L-147(reassigned), L-132
Relocations:
E-201/248
L-169/113
Also B-35 and E-221 went out on a box in their local to secure a crane.
297 Lenox Road
Report of Crane Hitting Building
12:25 BD to B-41 we are giving you a Major Tactical Response - Reports of Crane hitting building and ceilings coming down inside several apartments.
12:26 L-113: Payload hit side of building - No visible damage at this time - Going inside to check on repots of ceiling collapse
12:31 B-41: Keep resources coming in - We do have structural damage - a crack from parapet down to ground on exterior of building - Evacuations of A Line and Building are underway.
Possible partial list so far -
E-248, 249, 255
L-113, 147
B-41,
S-1
R-2
D-15
L-132 SOC Support Truck also transported RC-2
L-170 SOC Support Truck
R-5
FC
RB
SB
SOC - Compressor
SOC - Logistics
Car 10
COMMAND TAC
RAC-2
TAC-2
12:38 B-41: BD can you get an ETA on Buildings with a rush.
12:39 BD to B-41: OEM and Buildings are responding.
12:46 FC: Can you put a priority call in for the utilities, also OEM to respond and updated ETA for Buildings.
12:53 FC: Using All Hands - Structural integrity has been compromised on 6-story 100x200 H-type on Front Exposure 4 side wing - Crack runs from base to roof. Still waiting on Utilities, DOB, and OEM.
BD to FC: OEM has crew enroute, DOB states 30 minutes, contacting Utilities
13:14 FC per D-15: Primaries are Negative Throughout - Waiting for DOB - FC going 10-8 - numerous other SOC units went 10-8
13:27 D-15: PWH releasing E-249, E-255, and L-147
13:35 D-15: Do we have an ETA on Buildings
13:38 D-15: We get that ETA yet? BD: They are going to give us a call back.
13:39 BD to D-15: Buildings is giving an ETA of 15-20 minutes
13:45 D-15: Evacuating Exposure 4-A as a precaution.
13:49 D-15: Do you have ETA on TAC-2. TAC-2: 5 Minutes out.
13:50 D-15: Can you have a transit authority respond to the command post in reference tot he subway that runs along Nostrand.
13:53 D-15: Can you have the Communications Engine report to command post. Also the 2 and 5 lines that run along Nostrand need to be shut down
S/C E-332-Comm
14:32 D-15: Requesting 2 Trucks for relief.
S/C L-147(reassigned), L-132
Relocations:
E-201/248
L-169/113
Also B-35 and E-221 went out on a box in their local to secure a crane.