07/13/07 - Brooklyn - 3rd Alarm

tbendick

Administrator
Staff member
Joined
Dec 20, 2006
Messages
1,469
Brooklyn,  N. Y.  07/13/07  @  13:45 hrs.

Borough  Park  Section



Box  2574

address:              1350  38th.  St.

between:            13th.  Ave.    &    14th.  Ave.



2574  @  13:35

Engs.  282,  240,  281,  228*

Lad.  148,  Lad.  147

Batt.  48

Rescue Co. #2*

Squad  Co. #1*

*  4  Engs.  /  2  Tks.  /  Rescue  &  Sqd.  due  to  numerous  calls.



10 ? 75 ? 2574  @  13:37

Ladder  122  is  designated  as  the  ?FAST?  Truck

Engine  250  took  in  the  job

Batt.  41

Division  11



@  13:38

Special  Call  an  additional  Engine  &  Truck.

Engine  247  &  TowerLadder  157  are  s/c



Fire  Building:

2  Story  Frame  20 x 40  P / D

Surrounding  Properties:

Exp. #1:  Is  a  Street

Exp. #2:  Is  a  Similar  Type  attach

Exp. #3:  Is  a  Rear  Yard

Exp. #4:  Is  a  Similar  Type  attach



All ? Hands:

7 ? 5 ? 2587  @  13:42

Batt.  48  reports:    Box  2574,    We?re  using  All ? Hands.    We  have  a  fire  on  the  top  floor

of  a  2  story  frame  private  dwelling.    We  have  2 ? lines  being  stretched,    1 ? line  in 

operation.    Truck  Co?s  are  ?Opening  Up?        Fire  is  Doubtful.



@  13:45

? Batt.  48  to  Brooklyn,  Urgent !  Transmit  a  2nd.  Alarm.    We  have  fire  extension  into  the

cockloft. ?



2nd.  Alarm:

2 ? 2 ? 2574  @  13:45

Engs.  220,  201

TowerLadder  172

Eng.  284  w  /  Satellite  3

Batt.  40  ?Safety  Officer?

Batt.  33  ?Resource  Unit  Leader?

Rescue  Battalion  /  Safety  Battalion

Fieldcom  1  /  Tac  Support  Unit #2

Car  7:    Assist.  Chief  Kilduff



@  13:53

Batt.  48:    Box  2574,  We  have  fire  thru  the  top  floor  and  cockloft  of  the  Fire  Bldg.

and  top  floor  and  cockloft  of  Exp. #2.    Primary  search  of  the  1st.  floor  and  basement 

of  the  original  Fire  Bldg.  is  negative.  Primary  search  1st.  floor  of  Exp. #2  is  negative.

Fire  is  Doubtful.



@  14:03

Division  11:    At  Box  2574,    We  had  a  partial  roof  collapse  on  the  original  Fire  Bldg.

We  have  fire  on  the  top  floor  and  cockloft  of  Exp. #2  &  Exp. #4.    Truck?s  are  still

?Opening  Up?      Searches  are  still  being  conducted.      Fire  is  Doubtful.



@  14:12

Special  Call  ( 2 )  additional  Trucks.    TowerLadder  149    &    Ladder  109  are  s/c



3rd.  Alarm:

3 ? 3 ? 2574  @  14:22

Engs.  255,  330,  241,  249

Batt.  31

Batt.  42  ?Staging  Manager?

Batt.  39  ?Air  Re ? Con  Chief?

Mask  Service  Unit #1

Staging  Area:    12th.  Ave.  &  39th.  St.



@  14:26

Fieldcom  1:    Progress  report  for  the  3rd.  Alarm,  Box  2574,  Division  11,  Deputy  Chief  Mandela

reports:    We  have  4 ? lines  stretched,  3 ? lines  in  operation.    The  original  Fire  Bldg.  has  been

vacated  due  to  the  collapse  of  the  roof.    Fire  remains  top  floor  and  cockloft  of  both  Exp. #2

and  Exp. #4.    Setting  up  the  TowerLadder  at  this  time.      Still  Doubtful.



@  14:40

Fieldcom  1:    Progress  report  for  the  3rd.  Alarm,  Box  2574,  Division  11,  Deputy  Chief  Mandela

reports:    Main  body  of  fire  has  been  knocked  down.    After  an  evaluation  of  the  original  Fire

Bldg.    2 ? lines  have  been  moved  inside  to  extinguish  the  remaining  pockets  of  fire.    Still  have

fire  in  Exp. #2  &  Exp. #4  on  the  top  floor  and  cockloft.      Still    Doubtful.



@  14:46

Special  Call  ( 2 )  additional  Trucks.    TowerLadder  114    &    TowerLadder  131  are  s/c



@  15:03

Fieldcom  1:    Progress  report  for  the  3rd.  Alarm,  Box  2574,  Car  7,    Assist.  Chief  Kilduff  reports:

All  visible  fire  has  been  knocked  down  at  this  time.    Primary  searches  thru  out  Exp. #4  are

complete  and  negative.    Secondary  searches  in  the  Fire  Bldg.  and  Exp. #2  are  underway.

Fire  is  placed    Probably    Will    Hold.



@  15:15

Fieldcom  1:    Progress  report  for  the  3rd.  Alarm,  Box  2574,  Car  7,    Assist.  Chief  Kilduff  reports:

Secondary  searches  in  the  original  Fire  Bldg.  and  Exp. #2  &  Exp. #4  are  all  negative  thru  out.

Fire  is  UnderControl.



(  Job  Duration:    1 hr.  /  41  mins.  )



@  15:32

Special  Call  ( 2 )  Truck  Co?s  for    ?relief?      Ladder  113    &  Ladder  156  are  s/c



@  13:44

Special  Call  ( 2 )  Engine  Co?s  for  ?relief?      Eng.  248    &    Eng.  239  are  s/c

 
Top