- Joined
- Apr 13, 2012
- Messages
- 9,091
15-40 Hassock Street - NYCHA Redfern Houses
BC47 to QNS: 10-75, extra engine and truck for fire on the 3rd floor. Size up as per CIDS.
L-140 acting L-137 FAST
CIDS:
MD 7-story 30x100 class 1 irregular, no standpipe. 1 3/4 line permitted, only 1 stairway. Ongoing construction impacts FD operations.
QNS transmitting the All-Hands
BC47 to QNS: We're gonna use everyone thats 10-84, fire is KD. PWH. You can return the Division and return the extra 1&1 (E314/TL158 are 10-8)
BC47 to QNS: Primaries in the fire apartment are negative. Fire is in apartment 3E.
QNS to BC47: We're gonna have the FAST truck continue in.
BC47 to QNS: Under Control. Duration is 11 minutes.
*2nd job for the 47 today*
Probably:
E264, E328, E265, E266
L134, T121, L140/137F
BC. 47
*Anyone know who is first due engine here, 264 or 328? I'm always curious as to what dictates the engine response area in the Big House*
BC47 to QNS: 10-75, extra engine and truck for fire on the 3rd floor. Size up as per CIDS.
L-140 acting L-137 FAST
CIDS:
MD 7-story 30x100 class 1 irregular, no standpipe. 1 3/4 line permitted, only 1 stairway. Ongoing construction impacts FD operations.
QNS transmitting the All-Hands
BC47 to QNS: We're gonna use everyone thats 10-84, fire is KD. PWH. You can return the Division and return the extra 1&1 (E314/TL158 are 10-8)
BC47 to QNS: Primaries in the fire apartment are negative. Fire is in apartment 3E.
QNS to BC47: We're gonna have the FAST truck continue in.
BC47 to QNS: Under Control. Duration is 11 minutes.
*2nd job for the 47 today*
Probably:
E264, E328, E265, E266
L134, T121, L140/137F
BC. 47
*Anyone know who is first due engine here, 264 or 328? I'm always curious as to what dictates the engine response area in the Big House*
Last edited: