- Joined
- Jan 20, 2014
- Messages
- 20,981
Location: 201 W 14th St off 7th Ave.
B6 has a 15ft loadbearing wall collapse in the basement
Major Technical Response
E-3,Sq18,14,1
E-8 w/ R.C 1
E-44 w/ 2nd Piece
L-12,24,5(Fast)
L-7(Soc Support)
B-6,7
R-1,4
Sq-1,252
D-1
Rac-1
RB,SB
FC
Tac-1
CTU
HM-1
HMB
Soc Logistics
Soc Compressor
B6 has a 15ft loadbearing wall collapse in the basement
Major Technical Response
E-3,Sq18,14,1
E-8 w/ R.C 1
E-44 w/ 2nd Piece
L-12,24,5(Fast)
L-7(Soc Support)
B-6,7
R-1,4
Sq-1,252
D-1
Rac-1
RB,SB
FC
Tac-1
CTU
HM-1
HMB
Soc Logistics
Soc Compressor
Last edited: