Address: 262 5th Ave.
52 story 35'x100' Class 1 MD
(Mega Hi-Rise b'ldg. under construction)
Report of fire 31 st floor
Maybe,
E1, 16, 26, 65
E3 HRN
E14 CFRD
E7 Comm.
E8 LC
L24, 7, 12F
L3, 21, 4, 2
E39 w/HRU2
B6, 9, 8, 7, 11 S
S18
R1
D1
FC, RB, SB, RM, CTU1, HMB, HM1
RAC1
B7 initially unavailable
B6: using 1 Engine & 2 Trucks, investigating a smoke condition on the upper floors
B6 gave 10-77, interior solar panels of the elevator shaft burning on 43rd floor
L12F
D1: (1) precautionary line stretched, fire on exterior of 43rd floor
D1 gave All Hands
D1: solar panels are smoldering
FC: photovoltaic stop applied to the panels, which are no longer smoking - PWH
FC: as per D1 - UC (duration 1 hr. 36 min.)
B26 act. B9
B40 act. B7
B46 act. B8
E226 act. E3
E325 act. E39
L8 act. L24
L117 act. L7
L30 act. L2
E37 act. E1
52 story 35'x100' Class 1 MD
(Mega Hi-Rise b'ldg. under construction)
Report of fire 31 st floor
Maybe,
E1, 16, 26, 65
E3 HRN
E14 CFRD
E7 Comm.
E8 LC
L24, 7, 12F
L3, 21, 4, 2
E39 w/HRU2
B6, 9, 8, 7, 11 S
S18
R1
D1
FC, RB, SB, RM, CTU1, HMB, HM1
RAC1
B7 initially unavailable
B6: using 1 Engine & 2 Trucks, investigating a smoke condition on the upper floors
B6 gave 10-77, interior solar panels of the elevator shaft burning on 43rd floor
L12F
D1: (1) precautionary line stretched, fire on exterior of 43rd floor
D1 gave All Hands
D1: solar panels are smoldering
FC: photovoltaic stop applied to the panels, which are no longer smoking - PWH
FC: as per D1 - UC (duration 1 hr. 36 min.)
B26 act. B9
B40 act. B7
B46 act. B8
E226 act. E3
E325 act. E39
L8 act. L24
L117 act. L7
L30 act. L2
E37 act. E1
Last edited: