11/3/26 Manhattan All Hands 10-77 Box 662

Joined
Feb 9, 2018
Messages
5,034
Address: 262 5th Ave.

52 story 35'x100' Class 1 MD
(Mega Hi-Rise b'ldg. under construction)
Report of fire 31 st floor

Maybe,
E1, 16, 26, 65
E3 HRN
E14 CFRD
E7 Comm.
E8 LC
L24, 7, 12F
L3, 21, 4, 2
E39 w/HRU2
B6, 9, 8, 7, 11 S
S18
R1
D1
FC, RB, SB, RM, CTU1, HMB, HM1
RAC1
B7 initially unavailable

B6: using 1 Engine & 2 Trucks, investigating a smoke condition on the upper floors

B6 gave 10-77, interior solar panels of the elevator shaft burning on 43rd floor

L12F

D1: (1) precautionary line stretched, fire on exterior of 43rd floor

D1 gave All Hands

D1: solar panels are smoldering

FC: photovoltaic stop applied to the panels, which are no longer smoking - PWH

FC: as per D1 - UC (duration 1 hr. 36 min.)

B26 act. B9
B40 act. B7
B46 act. B8
E226 act. E3
E325 act. E39
L8 act. L24
L117 act. L7
L30 act. L2
E37 act. E1
 